
10
7.1 Dimensions
7 INSTALLATION PRECAUTIONS
Check the strength and level of the installation ground so that the unit may not cause any vibrations or noise during its
operation.
In accordance with the foundation drawing in the figure, fix the unit securely by means of foundation bolts. (Prepare four sets
each of
Φ
10 Expansion bolts, nuts and washers which are readily available in the market.)
Screw in the foundation bolts until their length is 20 mm from the foundation surface.
7.2 Installation requirements
(unit: mm)
Concrete
basement
h
≥
100mm
Rubber
shocking
proof mat
≥
100
≥
80
Φ
10 Expansion
bolt
Solid
ground
or roofing
Model
A
B
C
D
E
G
H
I
J
K
4/6kW
8/10/12/14/16kW
1295
1385
401
488
429
526
115
192
638
656
105
60
225
221
718
865
161
182
/
81
4/6 kW (unit: mm)
I
8/10/12/14/16 kW (unit: mm)
J
I
K
J
B
F
H
C
A
B
C
A
D
E
F
H
D
E
F
379
363
G
G
Содержание Aquantia KHP-MO 4 DVR2
Страница 2: ......
Страница 23: ...19 Tank booster heater n d e d n d Automatic air purge valve r d r manometer d r...
Страница 74: ...70 9 5 10 4...
Страница 84: ...20 21 Automatic air purge valve Pressure relief valve...
Страница 87: ...16125300002999 V C...
Страница 88: ......