ZHEJIANG KAYO MOTOR CO., LTD.
WWW.RIDEKAYO.COM
2.
Push down and gently pull the hood
forward to remove. (Be careful as the
tabs are easy to break)
3.
Installation:
In reverse order of
disassembly. Locate tabs into slots and
push to lock into place then install bolts
1 and 2 (note: replace hood plastic if
any of the tabs broke during
disassembly)
2.3.2 Handlebar
Disassembly
1.
Cut off power first. (disconnect
battery)
2.
Cut plastic cable ties, then disconnect
the combination switch, stop switch and
remove right grip.
3.
Remove the screws from the throttle
cap to access and disconnect the throttle
cable.
4.
Remove combination switch screws
and choke cable
5.
Remove the 4 handlebar clamp bolts.
Then remove the handlebars.
Bolts
1.And 2.
Содержание STORM 150
Страница 1: ...ZHEJIANG KAYO MOTOR CO LTD WWW RIDEKAYO COM Model A150 STORM 150 Service Manual...
Страница 20: ...ZHEJIANG KAYO MOTOR CO LTD WWW RIDEKAYO COM Stator ignition pickup gear indicator connector Ground cable...
Страница 96: ...ZHEJIANG KAYO MOTOR CO LTD www kayomoto us 96 Circuit diagram...