background image

Kaye LTR-150

Dry Block and Liquid Bath
All-in-One Temperature Calibrator

Operating Manual

Validation

M5101-EN Rev. B

 

 May 2018

Содержание LTR-150

Страница 1: ...Kaye LTR 150 Dry Block and Liquid Bath All in One Temperature Calibrator Operating Manual Validation M5101 EN Rev B May 2018...

Страница 2: ...on Safety Instructions 11 Silicone oil 11 Chapter 3 Specifications 12 Chapter 4 Getting Started 13 4 1 Unpack and Inspect 13 4 2 Placement 13 4 3 Connect to Main Power 14 4 4 LTR 150 Startup 14 15 4 4...

Страница 3: ...d Icons 31 7 3 Selecting Functions 32 7 4 Configuration Range Settings 32 7 5 Test Tasks 33 36 Chapter 8 Starting Standalone Manual Calibration 36 Chapter 9 Maintenance and Troubleshooting 40 9 1 Intr...

Страница 4: ...igned to interface directly with all Kaye products Validator AVS Validator 2000 IRTD ValProbe and RF ValProbe The firmware is backward compatible with all version of Kaye software without need for sof...

Страница 5: ...display and operation 5 Calibrator exhaust ventilation 6 Connection for external reference probe 7 USB Port for connection to Kaye hardware 8 Main switch with fuse and mains plug socket Calibrator bot...

Страница 6: ...ouple wells is included with a sleeve which can accommodate upwards of three 3 thermocouples The sleeves are optimized to handle 22AWG thermocouples which are similar to the ones currently utilized in...

Страница 7: ...he use of calibration liquids offers certain advantages if temperatures of unusual shape and or size require calibration The sensor cage can accommodate up to two 2 ValProbe rigid loggers The test ite...

Страница 8: ...Kaye implemented two main modes or menu s Remote Control mode and Standalone mode Remote Control mode is intended for Automatic Calibration utilizing Kaye Validator equipment Validator 2000 Validator...

Страница 9: ...adquarters in Germany at 49 0 7231 14335 0 1 6 Calibration and Repair Information To schedule and send the LTR 150 to Kaye for calibration or repair 1 Contact the Kaye Service Center in your area to s...

Страница 10: ...ssues General safety instructions In all work the existing national regulations for accident prevention and safety in the workplace must be complied with Any internal regulations of the operator must...

Страница 11: ...Always unscrew the transport cover before putting the micro bath into service to avoid excessive pressure Wait until the micro calibration bath has cooled down before screwing on the transport cover...

Страница 12: ...ange 25 C to 150 C 13 F to 302 F Stability 0 15 C 0 27 F Accuracy 1 C 1 8 F Block Dimensions Diameter 60 millimeters 2 36 inches Depth 170 millimeters 6 69 inches Display Unit Display Unit Brilliant C...

Страница 13: ...munications cable connection to Kaye hardware 1 10 Calibration Certificate 1 11 User Manual 1 Save the packaging The LTR 150 is delivered in special protective packaging Save the packaging for returni...

Страница 14: ...y accessible and easy to reach In an emergency pull the plug so that the machine is isolated from the mains 4 4 LTR 150 Startup Prior to powering up the LTR 150 perform the following tasks Unscrew the...

Страница 15: ...rner this will bring up a new screen with the following three options End Remote Control Switch Off and Cancel Tap on End Remote Control which will take you to the Standalone home screen Next tap on t...

Страница 16: ...tor Set Up window 4 4 3 Set Date and Time Select Date and Time from the Calibrator Set Up window Options are available to change the date and time format By tapping the respective field a window is op...

Страница 17: ...on the cancel X icon in the upper right hand corner then Switch Off A Switch Off Calibrator screen will appear with a temporary message stating system data are saved please wait eventually followed by...

Страница 18: ...cteristic values are influenced by different factors such as diameter type and material of the measuring insert number and diameter of the bore holes or the physical properties of the calibration liqu...

Страница 19: ...gently clean with a dry cloth Place the prongs of the insert exchange tool into the holes of the dry well insert Apply pressure against the prongs by grasping each side of the insert exchange tool st...

Страница 20: ...tion Let the calibrator cool before installing the TC fixture Screw the TC housing onto the dry block thread Please do not overtighten Usage Place the thermocouple into the dry block route it through...

Страница 21: ...serves for secure closing of the micro bath It prevents spillage of the calibration liquid during transport Work cover The work cover fulfils various tasks during the operation It reduces the evaporat...

Страница 22: ...age Do not exceed the maximum fill level during operation Above the maximum fill level the heat dissipation is too great preventing compliance with the specified tolerances Overflow of the calibration...

Страница 23: ...magnetic stirrer in the tank tub insert Insert the sensor cage Insert the test sensors in the sensor cage This accounts for the volume of the sensors to be tested Fill the calibration liquid in the t...

Страница 24: ...ole is used for the External Reference Probe to measure the insert Inserting The surface insert is inserted into the metal block with the aid of the insert exchange tool Removing and cleaning Let the...

Страница 25: ...by a check mark Confirm selection by tapping the check mark icon in the bottom right hand corner to save the change and return you to the Standalone Main screen Information on the selected function wi...

Страница 26: ...Power on the Kaye validation system and allow it to acclimate in its testing environment for approximately 20 minutes prior to initiating calibration or calibration verification process 6 1 Starting...

Страница 27: ...e LTR 150 will boot up into Remote Control mode Verify the following are displayed Verify with Kaye validation software that on the calibration hardware screen that the LTR 150 is displayed as being c...

Страница 28: ...back to the start of test to view the historical trend by tapping down and sliding the grey box immediately to the left of the Auto Scale box To return to current time and temperature simply release h...

Страница 29: ...zing the easy to use touchscreen the user has the flexibility of configuring these parameters under Test Tasks Test tasks are containers for defined test conditions They are helpful for recurring test...

Страница 30: ...reach the Select Test Task screen There you can select the saved test tasks and create or configure your own test tasks Power Off By using the power icon you can switch the calibrator off Selected Te...

Страница 31: ...ayed Copy The selected entry is copied and the relevant screen is displayed Create New A new entry is generated for the selection list and the relevant screen is displayed Delete The selected entry in...

Страница 32: ...nstallation of the desired insert and setting of the associated function is detailed in Section 5 2 Setting Calibration Function 7 4 Configuration Range Settings The calibrator settings can be easily...

Страница 33: ...edited They serve as templates for your own self defined test tasks You can define your own test tasks for different test sequences These test tasks are directly saved in the calibrator for ready acce...

Страница 34: ...n must be suitable for the calibrator type and the measuring insert used Select the desired function by tapping on in the selection list Confirm the selection by using the icon The new function is ado...

Страница 35: ...he temperature dwell time and gradient and confirm the new values The new values are adopted and you will be returned to the previous window Calculate test points Here you can easily have the steps be...

Страница 36: ...is adopted and you will be returned to the previous window One Sided Step Selection Activate the parameter field by tapping if the test points are to be approached in succession from the first to the...

Страница 37: ...efore the testing process Before the start of the testing process check whether the instructions regarding the installation site and the operational position have been complied with the electrical con...

Страница 38: ...ence value RV in blue and target test point SP in red along with current elapsed time of test User can zoom in or out the graph by tapping on the plus or minus icons User can also scroll back to the s...

Страница 39: ...w next to Stop all the way to the left To obtain logged data tap on the data icon to bring up the Select Log Data screen Tap on the desired file then the check mark in the lower right hand corner The...

Страница 40: ...from getting stuck in the metal block 9 2 2 Micro Bath If recently used allow the LTR 150 to stabilize at room temperature before attempting to remove the micro bath components Remove the sensor cage...

Страница 41: ...cause and corrective action Problem Possible Cause Corrective Action LTR 150 and touch screen unresponsive Fuse has blown Replace both fuses even if only one is defective Unknown Power off unit wait a...

Страница 42: ...ng or usage or trade Appendix A Warranty and Return Policy If the Kaye LTR 150 malfunctions within the warranty period the following procedures must be completed 1 Contact the local Customer Support C...

Страница 43: ...43 M5101 EN Rev B Notes...

Страница 44: ...nsors com Brazil Sales and Service Amphenol TFC DO Brazil LTDA Rodovia Governador Adhemar Pereira de Barros KM 121 5 S N 13098 396 Campinas Sao Paulo Brazil Europe Asia Middle East Sales and Service A...

Отзывы: