KAUO HENG
COMPUTERIZED FLAT KNITTING MACHINE
KH-323 SERIES – V2
OPERATION MANUAL
6
2. Installation
○
1
After unpacking and locating the machine in the factory, it must be leveled
carefully with a spirit-level to avoid machine distortion in running. We
recommend the machine to be leveled with rubber padding for best result.
Remove grease from the polished parts before starting to operate the
machine. About the moving parts must be lubricated and cleaning according
to the following instruction.
Maintenance of machine :
※
Cleaning
Where to clean
Interval
Top tension equipment
Every 8-12 hours
Side tension equipment
Every 8-12 hours
Needle beds (front & back)
Every 8-12 hours
Yarn feeders
Every 8-12 hours
Содержание KH-323 SERIES - V2
Страница 1: ...KAUOHENG KH 323 SERIES V2 OPERATION MANUAL 電腦橫編織機 KH COMPUTERIZED FLAT KNITTING MACHINE ...
Страница 54: ......