SM-100 CERTISAFE™ SUSPENDED MOUNT
MANUAL
852112 / 2021.1.1
10
SUSPENSION CHAINS AND POWER CABLE
1.
Insert one end link of a long chain (G) into an outer jaw slide (B)
placed at the end of the stretcher bar.
2.
Secure with a 1/4”-20 X 1/2” shoulder screw (C) and 1/4”-20
locknut (E).
3.
Repeat steps 1 and 2 to secure the remaining long chain (G) at
the opposite end of the stretcher bar (A).
4. Tighten stretcher bar fasteners, taking care not to over-tighten.
5.
Use zip ties (I) to secure the power cord to the stretcher bar (A) in two places and to guide the cord around the corner where the
bar meets the long chain, making sure not to put tension on the power cable.
6.
Continue to apply the zip ties (I) every 4 feet along the long chain (G) and power cable length.
7.
Attach the long chain (G)
with
the power cord to the connecting link (N) closest to the cord grip (O).
8. Attach the long chain (G)
without
the cord to the connecting link (N) farthest from cord grip (O).
9. Coil any excess chain and tie with wire.
G
C
E
B
Fig. 11
I
A
G
Fig. 12
O
Fig. 14
N
G
Steel tank roof
G
N
Fig. 15
Back to Contents