SM-100 SUSPENDED MOUNT MANUAL
7
• The maximum
tank roof thickness accommodated by the tank penetration parts included is 1/8”.
•
Suggested measurements are based on a 24” square access hatch.
1.
Drill two 3/8” clearance holes through the tank, 58” apart, each 29” from the tank hatch center point.
These are for the eye bolts (J).
2. Deburr both sides of each hole.
3.
Drill a 7/8” clearance hole approximately 4” from one of the holes drilled in step 1. This is for the cord
grip (O).
4. Deburr both sides of the third hole.
5.
From the tank exterior, pass the O-ringed side of the cord grip (O) through the 7/8” hole, with the O-ring
outside the tank roof.
6.
From the tank interior, fit the cord grip nut (P) on the
threads protruding into the tank.
7. Tighten the nut until snug, being careful not to
over-tighten.
Steel tank roof
Steel tank roof
Tank hatch center point
TANK PENETRATION
Ø 3/8”
Ø 7/8”
4”
29”
29”
Ø 3/8”
P
O
5
6
Back to Contents