background image

 

 
2 ONBOARD INSTALLATION  

The mast should be cut with the drilling template supplied with the product to install the bracket. 

      

 

Max compression is applied on surface A, the mast thickness has to be as closed to 15mm but should not exceed it. 
Surface B has to be in direct contact with the wall, which means the inside wall surface should be flat. 
Tighten the bracket with a minimum of two M8 countersunk head screws. 
 

Installing the inside mechanism. 

 

Insert the lock mechanism (D) into the mast bracket (C). 
Close the lock with the front cover (E) and the Two M5 screws (F) secured with Loctite. 
 

Отзывы: