OPERATION AND HANDLING OF THE
TG-241 SERIES
15
Rev.2
23-10-15
1st Intermediate position:
Hold the stretcher firmly with both hands to prevent it from making dangerous
movements.
Then the stretcher can also be inclined on one part (front or rear) by activating the
controls as described above.
To perform this manoeuvre, activate the brakes on the front wheels and place them in
the position shown on the adhesive, before activating the red lever at the side.
The position is achieved by activating the intermediate position lever (red) located on the
right-hand side of the stretcher. This releases the front legs up to a mechanical stop.
Then apply the rear control (orange) once until it reaches the first position.
To return to the unfolded leg position, lift the stretcher slightly and raise ithe front legs
using your foot.
Содержание TG-241 Series
Страница 2: ......
Страница 4: ...OPERATION AND HANDLING OF THE TG 241 SERIES 2 Rev 2 23 10 15...
Страница 22: ...OPERATION AND HANDLING OF THE TG 241 SERIES 20 Rev 2 23 10 15 5 EXPLODED VIEWS 5 1 TG 241 S...
Страница 23: ...OPERATION AND HANDLING OF THE TG 241 SERIES 21 Rev 2 23 10 15...
Страница 24: ...OPERATION AND HANDLING OF THE TG 241 SERIES 22 Rev 2 23 10 15...
Страница 25: ...OPERATION AND HANDLING OF THE TG 241 SERIES 23 Rev 2 23 10 15...
Страница 26: ...OPERATION AND HANDLING OF THE TG 241 SERIES 24 Rev 2 23 10 15 5 2 TG 241 M...
Страница 27: ...OPERATION AND HANDLING OF THE TG 241 SERIES 25 Rev 2 23 10 15...
Страница 28: ...OPERATION AND HANDLING OF THE TG 241 SERIES 26 Rev 2 23 10 15...
Страница 29: ...OPERATION AND HANDLING OF THE TG 241 SERIES 27 Rev 2 23 10 15...
Страница 30: ...OPERATION AND HANDLING OF THE TG 241 SERIES 28 Rev 2 23 10 15...
Страница 31: ...OPERATION AND HANDLING OF THE TG 241 SERIES 29 Rev 2 23 10 15 5 3 TG 241 L...
Страница 32: ...OPERATION AND HANDLING OF THE TG 241 SERIES 30 Rev 2 23 10 15...
Страница 33: ...OPERATION AND HANDLING OF THE TG 241 SERIES 31 Rev 2 23 10 15...
Страница 34: ...OPERATION AND HANDLING OF THE TG 241 SERIES 32 Rev 2 23 10 15...
Страница 36: ...OPERATION AND HANDLING OF THE TG 241 SERIES 34 Rev 2 23 10 15...
Страница 37: ...OPERATION AND HANDLING OF THE TG 241 SERIES 35 Rev 2 23 10 15 Certified management system...