Instructions – 90001
For Technical Support Call: 800-343-7486, Monday-Friday, 7AM - 4 PM (PST)
Page 11
Step 1B – Permanent Installation:
Position front footplate on the truck bedrail, as far forward as possible, as per above.
Position a rear footplate on the bedrail, with the foot U-bracket saddle located near the rear stake pocket.
Locate the best hole in the footplate for drilling through the bed rail. We recommend using the hole
farthest from the foot U-bracket saddle and another hole nearer the U-bracket saddle.
Using a 13/32” drill bit, drill
through the bed rails in the
location of the holes
selected.
Using a 3/8” x 1-3/4” button
head screw, bolt through foot
and bed, into a 3/8” washer
and 3/8” jam nut.
Snug tighten.
Repeat for opposite side.
Step 2 – Assemble Side Channels
Apply sealant entirely around each swaged joint.
Push rear side channel into front side channel until
holes in gussets align.
Using 5/16” x 3/4” hex head bolts, 5/16” washers, and
5/16” lock nuts, bolt front side channel to rear side
channel.
TIGHTEN hardware.
Remove excess sealant.
Repeat for second front and rear sided channels.
Be sure screws are
directed downward.
5/16” x 3/4” Hex Head Bolts
3/8” X 1-3/4” Button
Head Screws