– 5
1 I: Heater on
0: Heater off
2
Temperature too high
Temperature OK
Temperature too low
Temperature measurement de-
fective
3 I: Pump switched on
0: Pump switched off
Time elapsed, switch pump off
and back on
4 I: Fill level OK
0: Filling level too low
5
Voltage OK
Align the appliance horizontally at the
installation site.
Remove rinsing and sieving floor by lift-
ing upward.
Unpack the sieving floor and place it on
the opening in the basin.
Unpack the filter mat and place it on the
sieving floor with the white side on the
top.
Insert the sieve in the basin.
Pour 80 litres of RM PC-BIO detergent
slowly into the basin.
Caution
Adding any other detergent solutions other
than RM PC-BIO can deactivate the mi-
crobes; bio-degradation of grease and oily
dirt will be hampered. Do not add water,
solvents, cleaning petrol, petroleum,
bleaching agents or disinfectants in the ma-
chine.
Insert the mains plug into the socket.
For connection values, see technical
data and type plate.
The device needs approx. 1 hour till the
water temperature reaches approx.
38 °C.
Cleaning takes place manually via the
cleaning tools.
Wear safety gloves and safety goggles.
Place the parts to be cleaned (max. 100
kg) on the rinsing floor.
Set the "Pump ON/OFF" switch to "1/
ON".
Open the shut-off valve of the desired
cleaning tool.
Note
It is possible to simultaneously open multi-
ple cleaning tools.
Clean the parts.
After completing the cleaning:
Set the "Pump ON/OFF" switch to
"OFF/0".
Note
The pump automatically switches off after
10 minutes. Briefly switch off and on the
the "Pump ON/OFF" switch to restart.
Switch off the pump after completing the
cleaning tasks; this will save unnecessary
loss of detergent due to evaporation.
몇
Warning
If the device remains switched on during a
power failure, then the pump will start as
soon as power supply is restored. Set the
"Pump ON/OFF" switch to "OFF/0" when-
ever there is a power failure.
LEDs
Start up
Operation
19
EN
Содержание PC 100 M1 Bio
Страница 2: ...2...
Страница 131: ...2 131 EL...
Страница 132: ...3 IEC 60364 30 mA 132 EL...
Страница 133: ...4 3 133 EL...
Страница 134: ...5 1 2 3 4 5 6 7 8 9 10 11 ON OFF 12 13 14 LED 15 16 17 18 19 20 PC 100 M2 BIO 134 EL...
Страница 135: ...6 1 I 0 2 3 I 0 4 I 0 5 80 RM PC BIO RM PC BIO 1 38 C 100 kg ON OFF 1 ON ON OFF OFF 0 10 ON OFF LED 135 EL...
Страница 136: ...7 ON OFF Off 0 ON OFF OFF 0 38 C RM 20 RM PC BIO 2 136 EL...
Страница 138: ...9 RM 20 ON OFF OFF ON 138 EL...
Страница 139: ...10 RM 139 EL...
Страница 154: ...2 154 RU...
Страница 155: ...3 IEC 60364 30 155 RU...
Страница 156: ...4 BGV A3 156 RU...
Страница 157: ...5 1 2 3 4 5 6 7 8 9 10 11 12 Ko 13 Ko 14 15 16 17 18 19 20 PC 100 M2 BIO 157 RU...
Страница 158: ...6 1 0 2 3 0 4 0 5 80 RM PC BIO RM PC BIO 38 1 100 1 0 10 158 RU...
Страница 159: ...7 0 0 38 C RM 20 RM PC BIO 159 RU...
Страница 161: ...9 RM 20 Pump Pump 161 RU...
Страница 162: ...10 Ko RM 162 RU...
Страница 232: ...http www kaercher com dealersearch...