44
English
9.808-230.0 Rev. 01 (03/20)
ACBP Uninstall / install control panel board
AKBE Uninstall / install disc brush
AEAA Lay the device on its side for maintenance work
AKBW Uninstall/ install cleaning head
AKMG Uninstall / install brush motor
1 Screws
2 Cover
Unscrew the screws.
Remove cover.
Take the cable harness out of the device.
Installation information
Mind correct installation of the lines.
Note
Bp variant:
1 Main connector
2 Positive terminal with red protective cover
3 Negative terminal with black protective cover
Installation information
Observe the symbols on the main connector.
Assemble the battery cables of the main connector accord-
ingly.
AHKB Uninstall / install cable harness
Содержание BD 43/25 C Bp
Страница 72: ...72 English 9 808 230 0 Rev 01 03 20 Note Ep variant Cable harness ...
Страница 73: ...English 9 808 230 0 Rev 01 03 20 73 Mains cable with mains plug 9 763 064 0 Brush motor 9 763 118 0 ...
Страница 74: ...74 English 9 808 230 0 Rev 01 03 20 Mains distribution 9 763 119 0 Suction turbine 9 763 120 0 ...
Страница 75: ...English 9 808 230 0 Rev 01 03 20 75 Indicator light voltage supply 9 763 122 0 ...
Страница 150: ...Español 9 808 230 0 Rev 01 03 20 150 Nota Variante Ep arnés de cables ...
Страница 151: ...151 Español 9 808 230 0 Rev 01 03 20 Cable de conexión a red y enchufe de red 9 763 064 0 Motor de cepillos 9 763 118 0 ...
Страница 152: ...Español 9 808 230 0 Rev 01 03 20 152 Distribución de red 9 763 119 0 turbina de aspiración 9 763 120 0 ...
Страница 153: ...153 Español 9 808 230 0 Rev 01 03 20 Alimentación de tensión del piloto de control 9 763 122 0 ...
Страница 226: ...Français 9 808 230 0 Rev 01 03 20 226 Remarque Variante Ep Faisceau de câbles ...
Страница 228: ...Français 9 808 230 0 Rev 01 03 20 228 Alimentation réseau 9 763 119 0 Turbine d aspiration 9 763 120 0 ...
Страница 229: ...229 Français 9 808 230 0 Rev 01 03 20 Témoin de contrôle de l alimentation électrique 9 763 122 0 ...