
ceramic
tile wall
ceramic
tile wall
ceramic
tile wall
protective
box
7. Installation of main control panel
1. Installation method of framed panel
Screwdriver
panel
face frame
face frame
face frame
face frame
nduction eye
nduction eye
sucker
Plug in wire
induction eye
face frame
manual button
Only for the machine
with manual button
Screwdriver
1. Unscrew the two screws on the protection box with a screwdriver and take out the protective box after
the main machine is put into the wall according to the installation requirements and the wall is tiled.
2. Suck it with a sucker or gently push it straight from the back with your hand to remove the stainless
steel panel sucked on the face frame.
3. Connect the black male plug of the electric eye with the black female plug of the solenoid valve. Con-
nect the red male plug of the power supply or battery box with the red female plug of the electric eye. (for
AC and DC products, the red male plug of the battery box is connected with the red female plug of the
power supply).
4. Put the face frame on the installation position of the wall, then put four M4*40 machine screws through
the mounting holes on the four corners of the face frame and face the screw holes on the main box.
Tighten the screws with a screwdriver to make the face frame firmly installed without loosening.
5. After fixing the face frame, place the stainless steel panel on the corresponding position of the face
frame. Let the magnet on the face frame tightly attract it, so that it cannot loose and fall.
KARAT URINAL SENSOR