Karat AC Скачать руководство пользователя страница 7

Note:

Note:

ceramic 
tiles

ceramic 
tiles

ceramic 
tiles

host 

machine

box

metal hose

draining pipe

2. Wall tiles: Only metal hose joints           
    and drain pipe joints that can be     
    freely retracted are reserved

The slot of metal hoses cannot be filled 
with cement. The ceramic tile surface 
shall not be lower than the top surface of 
the protective box.

The ceramic tile surface shall 

not be lower than the top 

surface of the protective box

ceramic tile wall

No filler

Metal hose

back water inlet joint

wall

urinal

urinal

draining 
pipe

protective

 box

ceramic tiles

ceramic tiles

3. Connect the metal hose firmly with the water inlet connector behind the urinal.
4. Hang and secure the urinal, and insert the drain into the reserved groove.

1. Before installing and connecting the sensor host, be sure to wash the sundries in the water        
    pipe to prevent blocking the solenoid valve filter screen;
2. A sealing ring shall be placed in each connector to prevent water leakage.

KARAT URINAL SENSOR

Содержание AC

Страница 1: ...Product installation and operation manual KARAT URINAL SENSOR...

Страница 2: ...ively eliminate cross infection of bacteria 4 Applicability the product has beautiful appearance simple and convenient installation and is suitable for all kinds of new construction sites and refittin...

Страница 3: ...on Integrated pane fixed bracket to match the integrated panel Assembly of mechanical button framed panel face frame to match the framed panel Solenoid valve Protection box Solenoid valve with button...

Страница 4: ...Depth of wall excavation 90mm Depth of wall excavation 90mm The ceramic tile surface shall not be lower than the top surface of the protective box The ceramic tile surface shall not be lower than the...

Страница 5: ...ng ring must be placed in the union After installation open the water source to confirm that there is no water leakage and then proceed to the next installation work protect the urinal before flushing...

Страница 6: ...nlet installation mode ceramic tile protective box Connect to the elbow Install the protective box fill the gap with cement and paste tiles the ceramic tile surface cannot be lower than the top surfac...

Страница 7: ...n the top surface of the protective box ceramic tile wall No filler Metal hose back water inlet joint wall urinal urinal draining pipe protective box ceramic tiles ceramic tiles 3 Connect the metal ho...

Страница 8: ...l sucked on the face frame 3 Connect the black male plug of the electric eye with the black female plug of the solenoid valve Con nect the red male plug of the power supply or battery box with the red...

Страница 9: ...power pair wiring in the main box 3 Align the two mounting holes on the face frame with the two mounting holes in the middle of the host bottom box and then fix the face frame on the host bottom box...

Страница 10: ...be carried out after the user leaves environmental protection and water saving design The sensor will be auto matically cleaned and flushed once without being used for 24 hours The sensing distance o...

Страница 11: ...ot inductive or the power supply is in poor contact please turn off the power immediately and find relevant professionals for mainte nance to avoid electric shock or other accidents battery box Batter...

Страница 12: ...If there are obstacles or dirt in front of the induction window that will affect the normal induction the obstacles must be cleared and the induction window must be cleaned in time Adjust the regulat...

Страница 13: ...her to adjust Whether it is loose or not connected Abnormal water supply Check the water source Turn on the water supply Adjust with remote control Tighten all connectors Clean the filter Cleaning sol...

Отзывы: