C O N T R O L C E N T R E
156
156
156
156
where:
switchN
–
is the optional command line switch of Control Centre
.
!"
You can use more than one switch in the Control Centre command
line. For the complete list
of available command line switches refer to
subchapter 15.8 Appendix B.
13.3. Scheduling performance of
package component-based
tasks
You can schedule a task to be performed once within the current Control
Centre session. You can also define and edit the schedule for tasks to be
performed within the required period.
Creation and editing of the task performance schedule is performed from
the command line. The general format of the task-scheduling command
line is:
./kavucc instruction1=["task_parameters"] […] [instructionN=["task_parameters"]]
#"
Before you begin scheduling performance of the Kaspersky Anti-
Virus for xBSD File Server tasks, you must launch the Control
Centre program (for details on the Control Centre command line
refer to subchapter 13.2).
$"
To schedule a task to be performed once within the current
Control Centre session,
enter the following strings in the command line:
./kavucc -cp="prgname -a:arg[:arg1[…]] -u=username
-e=hour:min"
where:
prgname
is the name of the
prgname
program executable file
;
–a:arg[:arg1[…]]
are the
prgname
performance parameters
;