
TO
YOTA
CA
M
RY
20
18
P
ANASO
N
IC
+
CarP
lay
1
Install Manual
6. LVDS FPC Cable Connection
▲
Remove the bolts
2
▲
Genuine FPC cable removal
3
▲
Connecting the Supplied FFC Cable
4
▲
Connecting the supplied FFC cable to
the supplied SUB board.
5
▲
On the supplied SUB board Genuine
FPC cable connection.
6
▲
With the marked hole Insert one end
of the LVDS cable.
7
▲
Provided on the supplied SUB board LVDS cable connection.
All FFC cables
Connect to see blue