INSTALLATION MANUAL / USER MANUAL
REMOTE CONTROL PANELS RC200 / RC200 NVG
PAGE: 15
OCT 03/2013
D. RCP operational tests
Check correct operation of RCP visual indicator by switching ELT and RCP
as described in the following sequential procedure,
(with ELT switch in the «ARM» position).
Figure 11: RCP visual indicator operation
Nur für den Unterricht