Venkon
Assembly, installation and operating instructions
66
Condensation water connection
Check whether the condensation tray is free of building rubble.
Check the condensation drain and operation of the alarm signal on the condensation pump.
Check whether the cooling valve switches off in the event of an alarm signal.
Check whether the unit is connected leak-free to the on-site condensation connection.
Check whether the waste water lines are clean and have a sufficient gradient.
Check whether the condensation pump has a working power supply.
Once all checks have been completed, initial commissioning can be carried out in line with
Содержание Venkon Series
Страница 2: ......
Страница 86: ...Venkon Assembly installation and operating instructions 86 13 Certificates...
Страница 90: ......
Страница 91: ......