4
2.55
ProtecTor
A new dimension in door screening
Installation and operating manual
10. Commissioning
............................................................................ 43
10.1 Pre-commissioning checks ........................................................... 43
10.2 Venting the heat exchanger ......................................................... 43
10.3 Commissioning ............................................................................ 43
10.4 Post-commissioning checks .......................................................... 44
11 Operation
..................................................................................... 45
11.1 Operation of the electromechanical control ................................. 45
11.2 Operation of the KaController ..................................................... 45
11.2.1 Function keys, display elements ................................................. 45
12. Decommissioning (longer term)
................................................ 47
13. Maintenance
............................................................................... 47
13.1 Housing ....................................................................................... 47
13.2 Heat exchanger ........................................................................... 47
13.3 Motor ....................................................................................... 47
14 Faults
............................................................................................ 48
14.1 All ProtecTor ................................................................................ 48
14.2 AC three-phase motor with motor junction box, type ...66/76 ..... 48
14.3 EC single-phase motor with motor junction box, type ...63/73 .... 48
15 Disposal
........................................................................................ 49
16 Declaration of Conformity
.......................................................... 50