5
Starting from one end of the tent,
unscrew the top cap, of the inflation
valve, and attach the pump nozzle (4).
Pump up each AirPole. (5). The pump
has a pressure gauge and each
AirPole should be inflated to 7 psi
(0.482 bar). As each AirPole is
inflated the tent will lift. It is normally
necessary to go inside the tent and to
push the poles upwards so that the
AirPoles can assume their correct
shape (6).
Once all the AirPoles have sprung
outwards, assuming their correct
shape, detach the pump from the tent
and tighten the outer valve cap on
each inflation point. It is important that
these are tight to prevent the seepage
of air.
You may need to use a guy rope to
keep the tent upright in place whilst
pegging.
Close all doors and entrances and
check the positioning of the corner
pegs again. If necessary re-peg to
ensure that the groundsheet is taut
inside the tent.
Peg all the intermediate pegging
points ensuring that each side is
straight.
Thread the front canopy pole through
the tent sleeve (7).
4
5
7
6