11
Fixed expansion screw
a. Fasten the expansion screw to the load-bearing wall
Wall mounted battery
b. Fasten the battery to the expansion screw
Pair plugging positive and
negative power cables
c.Insert the positive and negative power cord pairs between the
battery and the inverter
Docking inverter and battery
communication cable
d.According to the communication protocol port of the inverter,
one end of the communication line between the inverter and the
battery is plugged into the CAN or RS485 port of the battery,
and the other end is plugged into the inverter.
Dial the ADD address switch
e.If it is a battery, dial 1, and the rules of other dialing addresses
are detailed in the attached page.
turn on the switch
f.Press the power switch on the side to let the ON/OFF RUN 6
Assembly and
commissioning
step number
Name
Assembly Instructions
step 1
step 2
step 3
step 4
step 5
step 6
battery indicator lights display in green
3.3.1 lnstallation steps
3.4.1 Precautions for Installing Batteries
50cm
50cm
20cm
20cm
Install the machine
Before choosing an installation location, consider the following:
1
Do not install the battery on flammable building
materials
2
Mount on a solid wall
3
Install this inverter at eye level to read the LCD display
at all times
4
To ensure optimum operation, the ambient
temperature should be between 0 ° C and 55 ° C.
Vertical wall installation is recommended
5
Make sure there is a certain amount of free space
around the inverter, as shown on the right, to ensure
adequate heat dissipation and enough room to move
the wires.
Suitable for installation on concrete or other non-combustible surfaces
(
KMD-PJ Series
)
Содержание KMD-PJ24100
Страница 1: ......
Страница 3: ...01 ...
Страница 6: ...04 PARALLEL RS485 RS232 CAN RS485 4321 DRY ADD RST KMD PC Series 10 ...