![KAMA EV 91DHMV Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/kama/ev-91dhmv/ev-91dhmv_operation-and-maintenance-manual_651290006.webp)
2.5 UNPACKING THE MACHINE
When unpacking the machine, make sure
that the package contains the parts
described; the Manufacturer shall not be
held responsible for errors or missing parts following f
days after delivery.
ive
persons an
lowered
The packing material must be disposed of according to
current environmental protection regulations,
"cemented" steel parts.
2.6 LIFTING AND HANDLING
The machine lifting and handling operations
must always be carried out by two adult
d with the machine head completely
(F. 3).
2.7 OVERALL DIMENSIONS
2.8 WEIGHT=kg40
2.10 COMPONENTS
1) Base
2) Vise crank
3) Vise
4) Machine body
5) Saw tension lever
6) Grip
7) On/Off switch
8) Cutting speed regulator
9) Screw (or lever) Mobile blade guide lock lever
10) Mobile blade guide
10/a) Fixed blade guide
11) Saw blade
12) Electric motor
13) 45° rotation unit
14) Power cable for power supply
15) Vice sliding guides
16) Piece supporting guides
17) Vise sliding locking knob
18) Emergency push-button (for operation with
vertical saw)
19) Start push-button (vertical operation)
20) Stop push-button (vertical operation)
21) Vertical machine position sensor
microswitch
22) Table for vertical machining
23) Head locking pin, in vertical position
24) Work stop
Содержание EV 91DHMV
Страница 7: ......