6
www.KALORIK.com
VC 47706 - 201010
BEFORE THE FIRST USE
Installing the Wall Mount Charging Station
•
Choose location near power outlet to install the wallmount. Ensure
no pipe work (gas, water, air) or electrical cables,wires or ductwork
are located directly behind the mounting area.
It is recommended
to use protective clothing, eyeware and materials when installing
the docking station.
•
Locate point high enough on wall to allow stick and power brush to
hang freely.
•
Place wall mount (
A
) against wall and use pencil to mark drill holes.
•
Drill
holes (with 1/4” bit) and insert drywall anchors
(
B
).
•
Insert screws (
C
) through holes on mount and tighten until firmly
attached.
Assembling the Appliance
1.
Slide the stick onto main body until it clicks
2.
Push the stick into power brush until it clicks
3.
Accessories can be connected to the stick for higher, tough to
reach spots.
A
B
C