background image

Operating Instructions Powador 1501xi/2501xi*/3501xi/4501xi/5001xi**

Page 9

4.5  Level 2 menu - Confi guration mode

 

  Time set (hour)

 

  Time set (minute)

 

  Date set (year)

 

  Date set (month)

 

  Date set (day)

 

 

 

  Display of software version

 

  Clear the power meter

 

  Select and set RS485 

  

interface 

address

 
  

Quick 

start

Figure 4.5: 

Confi guration mode menu

Setting the time and date 

The setting values are continuous, i.e. after you reach the 
maximum value, the display returns to the minimum value the 
next time key “1” is pressed. When setting the year in the 
date display, the year setting value goes up to 2050. It then 
returns to 2005.

Clearing the grid feed meter

When the grid feed meter is cleared, the values for “Daily 
peak capacity”, “Yield today”, “Annual yield”, “Total yield”, 
“Operating hours today”, “Annual operating hours” and “Total 
operating hours” are cleared. The required code is “2” and is 
entered using key “2”.

Choice of interface and address setting

With the menu item “Select interface“, you can use key “2” to 
switch between the RS232 and RS485 interfaces.

If the RS485 interface is activated, you can reach the address 
setting by pressing key “1”. You can set the address from 1 to 
32 by continuously pressing key “2”. The address then returns 
to 1. 
The RS485 interface is used to communicate with the
Powador-proLOG. If several inverters are connected to a 
Powador-proLOG, each address may only be used once. It is, 
therefore, possible to monitor 32 Powador inverters with one 
Powador-proLOG.

4.6  Night start-up key

Figure 4.6: 

Underside of the Powador 

Legend
1

 

Night start-up key

 

For activating the display after nightfall

2

 

RS232 interface

 

The unit switches off in the evening as nightfall approaches. 
The display is no longer shown. In order to retrieve the values 
for the current day after the display has switched off, the unit 
can also be activated during the night by pressing the night 
start-up key (see fi gure 4.6).

S e c t i o n   4   ·

 

O p e r a t i o n

ACTION

To access confi guration mode (level 2), press both keys 
simultaneously for approx. 1 second. Pressing key “1” 
now switches to the next menu item and changes can be 
made  in  the  respective  menu  item  by  pressing  key  “2”. 
The setting value increases each time key “2” is pressed. 
If the maximum value has been reached, the value returns 
to the minimum setting choice. The various settings are 
shown in fi gure 4.5.

NOTE

The grid feed meter can only be cleared. You cannot set 
the meter to a specifi c value.

ACTION

To do this, press the night start-up key “1” on the underside 
of the unit for approx. 5 seconds until a display appears.

Содержание Powador 1501xi

Страница 1: ...Powador 1501xi Powador 2501xi Powador 3501xi Powador 4501xi Powador 5001xi Operating instructions Operator Skilled and authorised electrician available only in France available only in Korea and Spain...

Страница 2: ...nd Regulations 5 3 Notes on Installation and Operation 5 3 1 Intended use 5 3 2 Factory warranty and liability 5 3 3 Service 6 4 Operation 6 4 1 Overview of controls and displays 6 4 2 LED displays 6...

Страница 3: ...ions are delivered together with the respective components and additional parts of the system 1 1 Retention of documents Please pass these operating and installation instructions on to the plant opera...

Страница 4: ...nly be operated with a permanent connec tion to the public power grid The inverter is not intended for mobile use Any other or additional use is not considered the intended use The manufacturer suppli...

Страница 5: ...occur in exceptional cases In such cases KACO new energy GmbH will provide you with the maximum possible support KACO new energy GmbH will make every effort to remedy such faults in an expeditious ma...

Страница 6: ...s that the grid feed was stopped due to a fault The following faults activate LED 3 Line overvoltage or undervoltage Faulty line impedance or line frequency Generator voltage is too high Generator pow...

Страница 7: ...that is currently being fed into the grid The respective day s peak power that was fed into the grid for a short time Displays the current heat sink temperature in C If the unit becomes too hot either...

Страница 8: ...y pressing key 2 The address then returns to 1 The RS485 interface is used to communicate with the Powador proLOG If several inverters are connected to a Powador proLOG each address may only be used o...

Страница 9: ...ys it in various diagram types as a daily or monthly representation The PC however must also run continuously Because of the amount of energy used this type of monitoring only makes sense over limited...

Страница 10: ...been pressed for a longer period of time the power that is currently being fed into the grid is shown on the display You can use the control keys see section 4 3 to show the values and data that are...

Страница 11: ...down Protective function of the inverter when too much generator power is supplied 13 Protection shutdown Protective function of the inverter for short lived line failures 14 Line failure Possible lin...

Страница 12: ...y SMS text message fax or e mail remote access to the installation the representation of the PV installation on the Internet and much more are no problem whatsoever for the Powador proLOG Up to 32 inv...

Страница 13: ...of the inverter s pre fuse should be somewhat higher than the maximum grid feed current The line fuse immediately trips when the inverter switches to grid feed mode after the start up period is comple...

Страница 14: ...nerator power the grid separa tion relay is presumably faulty thus preventing the inverter from connecting Noise emission from the inverter Particular ambient condi tions When there are certain ambien...

Страница 15: ...e inverter and the corresponding transport packaging are made from recyclable raw materials Device Do not dispose of faulty inverters or accessories together with household waste Ensure that the old u...

Страница 16: ...tended use 6 3 2 Factory warranty and liability 6 3 3 Service 6 4 Technical Data 7 5 Device Description 11 5 1 Scope of delivery 11 5 2 Dimensioning the PV generator 11 5 3 Protection concepts 12 6 In...

Страница 17: ...hown on the name plate ful ls the fundamental requirements of the following relevant directives Directive concerning electromagnetic compatibility Council Directive 2004 108 EC Low voltage directive C...

Страница 18: ...from being inadvertently switched back on If measurements must be taken while the power supply is switched on never touch the electrical connections Remove all jewellery from your wrists and ngers Ens...

Страница 19: ...g cases Use of the units in ways not intended Improper installation and installation that does not comply with standards Improper operation Operation of units with defective protective equipment Unaut...

Страница 20: ...ection Varistors Output Electrical data Model 1501xi 2501xi 3501xi 4501xi 5001xi Rated power 1500 W 2500 W 3300 W 4600 W 4600 W Maximum power 1650 W 2750 W 3600 W 5060 W 5100 W Line voltage See sectio...

Страница 21: ...erter Mechanical and technical data Model 1501xi 2501xi 3501xi 4501xi 5001xi Visual displays LED PV generator green Grid feed green Fault red LCD 2 x 16 characters Controls 2 keys for operating the di...

Страница 22: ...in Hz Switch on value in seconds after a re start Operation resumption time in seconds after a fault Germany 190 264 253 V 47 5 50 2 180 30 Spain 196 254 49 0 51 0 180 180 Italy 190 264 49 7 50 3 180...

Страница 23: ...ge Scale line current Scale line current Scale DC link Scale DC link S0 interface Save parameters Erase parameters Parameter menu A Section 4 Technical Data Country specific parameter menu Minimal lin...

Страница 24: ...ange If the temperature increases from 25 C to 60 C the MPP voltage in 12 V modules decreases by approx 3 6 V per module 7 2 V for a 24 V module The MPP voltage of the entire string should be 125 V If...

Страница 25: ...lecting the inverter s place of installation attention should be paid to the following items Ensure good access to the unit for installation or any service work that may later be required Maintain the...

Страница 26: ...location the electrical connection to the unit can be established You must adhere to all mandatory safety regulations the currently required technical connection speci cations of the responsible power...

Страница 27: ...mounted should be secured as follows 1 5 mm 16 A 2 5 mm 20 A 4 0 mm 25 A 6 0 mm 35 A NEOZED gL safety fuses should be used available only in France available only in Korea and Spain Section 6 Install...

Страница 28: ...th the positive and the negative leads must be strictly isolated electrically from the earth potential PE ATTENTION Risk of damage Ensure that the polarity is correct when connecting the unit ACTION B...

Страница 29: ...hown in gure 6 7 and 6 8 respectively Figure 6 7 Assembly of the Tyco plug connectors Section 6 Installation and Start up ATTENTION To achieve protection class IP54 unused cable ttings must be closed...

Страница 30: ...nection On the inverter s control card rear panel of the door there are four terminals labelled RS485 A and B see gure 6 11 To connect several Powadors terminal A of one Powador is connected to termin...

Страница 31: ...riod is required in order to ensure that the generator voltage is continuously above the power delivery limit of 125 V A quick start routine is provided for startup and test purposes This routine circ...

Страница 32: ...ns Modifications may be made only in exceptional cases and only after having consulted with the manufacturer and the power supply company WARNING DANGER Disconnect the inverter from all power sources...

Страница 33: ...ent All display values are checked and calibrated prior to shipment If the voltage or current value shown on the display does not correspond with the actual measured value it can be adjusted If the va...

Страница 34: ...n verter When working on the photovoltaic module in ad dition to disconnecting from the grid the DC main switch on the generator terminal box or the DC plug connectors must always be disconnected at a...

Страница 35: ...a short period For this reason the capacity of the inverter s pre fuse should be somewhat higher than the maximum grid feed current The line fuse immediately trips when the inverter switches to grid...

Страница 36: ...ect the inverter it does not begin feeding into the grid until the input voltage once again falls below 500 V Noise emission from the inverter Particular ambient condi tions When there are certain amb...

Страница 37: ...J HOHFWULFDO HTXLSPHQW GHVLJQHG IRU XVH ZLWKLQ FHUWDLQ YROWDJH OLPLWV 6DIHW RI WKH GHYLFH 1 1 UHJDUGLQJ FOHDUDQFH DQG FUHHSDJH GLVWDQFHV LUHFWLYH FRQFHUQLQJ HOHFWURPDJQHWLF FRPSDWLELOLW QWHUIHUHQFH LP...

Страница 38: ...for photovoltaic systems with a single phase parallel coupling via an inverter in the public mains supply The automatic disconnection device is an integral part of the aforementioned inverter This se...

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ...31000580 01 090515 Gottfried Leibniz Stra e 1 74172 Neckarsulm Germany Phone 49 7132 3818 0 Fax 49 7132 3818 703 info kaco newenergy de www kaco newenergy de...

Отзывы: