1-24 (No.YD091)
9. [21] Ent. guide base assembly / [22] Worm wheel 2 / [23] Timing belt / [24] Center gear assembly
Fig.4-5-9
Note 9a:
How to attach the worm wheel 2 [22] .
Fig.4-5-9a
10. [25] Reel drive pulley assembly / [26] Push plate/ [27] Clutch lock gear (2) / [28] Clutch lock gear (1)
Fig.4-5-10
Note 10a:
After attaching (W1), confirm that pushes [26] from the
top and hit to MAIN DECK. If there are a rattling or incli-
nation in [26] , reconfirm the attachment of (P6). (Take
care to the oblique insertion of (P6).)
Note 10b:
Attach (P6) straight for it which does not get on on the
flange of [28]
26
(S2)
<Note9a>
[21]
[22]
[23]
[24]
[23]
Phase alignment
Mark (Red)
[22]
[34]
Align the phase of the rotary encoder assembly [34],
then attach it by aligning the phase hole of the
mechanism assembly.
(W1)
(P6)
(W1)
"A"
<Note10a>
Detail "A"
Flange
(P6)
<Note10b>
[28]
[25]
[26]
[27]
[28]