1-8 (No.YD088)
1.3
PREPARATION FOR SERVICING
1.3.1 How to Enter the Service Mode
1.3.1.1
About Optical Sensors
Caution:
An optical sensor system is used for the Tape Start and End
Sensors on this equipment. Carefully read and follow the in-
structions below. Otherwise the unit may operate erratically.
What to do for preparation
Insert a tape into the Deck Mechanism Assembly and press
the PLAY button. The tape will be loaded into the Deck Mech-
anism Assembly. Make sure the power is on, connect TP507
(S-INH) to GND. This will stop the function of Tape Start Sen-
sor, Tape End Sensor and Reel Sensors. (If these TPs are
connected before plugging in the unit, the function of the sen-
sors will stay valid.) See Fig. 1.
Note:
Because the Tape End Sensors are inactive, do not run a tape
all the way to the start or the end of the tape to avoid tape dam-
age.
Fig.1
TP507
S-INH
Q504
Q505
Содержание HR-V525SEF
Страница 37: ... No YD088 1 37 ...
Страница 51: ... No YD088 3 13 Packing materials and accessories parts list Unit 5 6 8 4 7 1 Block No M3MM 3 2 2 ...
Страница 54: ......
Страница 66: ...A 1 2 3 4 5 B C D E F G Main 7 7 section SHEET 7 HK4N1SCM7_rev0 TO SHEET 3 2 23 2 24 ...
Страница 67: ...A 1 2 3 4 5 B C D E F G AFV section SHEET 8 HK4N1SCAFV_rev0 TO CN701 SHEET 2 2 25 2 26 ...
Страница 72: ...2 35 2 36 ...
Страница 73: ......