(No.YD088)1-23
4.2
STANDARD MAINTENANCE
4.2.1 Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Notes:
(1) Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head)using 90% ethyl
alcohol.
(2) After cleaning the parts, do all DECK ADJUSTMENTS.
(3) For the reference numbers listed above, refer to Deck Exploded Views.
*
13
------ Recording model only
*
15
------ Not used in 2 head model.
h: Hours
: Cleaning : Replace
Deck
Periodic Serv ic e Schedule
Ref.No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
1
Cylinder Assembly
2
Loading Motor Assembly
4
Pulley Assembly
66
Tension Lever Assembly
9
ACE Head Assembly
57,58
Reel S, Reel T
11
Capstan Motor
12
Cap Belt
*13
FE Head
*15
F Brake Assembly (HI)
16
Idler Assembly (HI)
24
Pinch Arm Assembly
26
M Brake (SP) Assembly (HI)
27
M Brake (TU) Assembly (HI)
44
LDG Belt
Содержание HR-V525SEF
Страница 37: ... No YD088 1 37 ...
Страница 51: ... No YD088 3 13 Packing materials and accessories parts list Unit 5 6 8 4 7 1 Block No M3MM 3 2 2 ...
Страница 54: ......
Страница 66: ...A 1 2 3 4 5 B C D E F G Main 7 7 section SHEET 7 HK4N1SCM7_rev0 TO SHEET 3 2 23 2 24 ...
Страница 67: ...A 1 2 3 4 5 B C D E F G AFV section SHEET 8 HK4N1SCAFV_rev0 TO CN701 SHEET 2 2 25 2 26 ...
Страница 72: ...2 35 2 36 ...
Страница 73: ......