CHAPTER 2
Site Planning, Preparation, and
Specifications
•
Site Preparation Checklist for the JRR200 Route Reflector on page 29
•
JRR200 Site Guidelines and Requirements on page 30
•
JRR200 Rack and Cabinet Requirements on page 34
•
JRR200 Network Cable and Transceiver Planning on page 35
•
JRR200 Management and Console Port Connector Pinout Specifications on page 36
Site Preparation Checklist for the JRR200 Route Reflector
provides a checklist of tasks you need to perform when preparing a
site for installing the JRR200 Route Reflector.
Table 14: Site Preparation Checklist for JRR200 Route Reflector
Notes
Date
Performed
By
Additional
Information
Item or Task
Power
Measure distance between external power
sources and device installation site.
Locate sites for connection of system
grounding.
“JRR200 Power
System” on
page 22
Calculate the power consumption and
requirements.
Environment
“JRR200 Route
Reflector
Environmental
Specifications” on
page 30
Verify that environmental factors such as
temperature and humidity do not exceed
device tolerances.
29
Copyright © 2018, Juniper Networks, Inc.
Содержание JRR200
Страница 1: ...JRR200 Route Reflector Hardware Guide Modified 2018 08 15 Copyright 2018 Juniper Networks Inc...
Страница 8: ...Copyright 2018 Juniper Networks Inc viii JRR200 Route Reflector Hardware Guide...
Страница 10: ...Copyright 2018 Juniper Networks Inc x JRR200 Route Reflector Hardware Guide...
Страница 16: ...Copyright 2018 Juniper Networks Inc xvi JRR200 Route Reflector Hardware Guide...
Страница 28: ...Copyright 2018 Juniper Networks Inc 28 JRR200 Route Reflector Hardware Guide...
Страница 38: ...Copyright 2018 Juniper Networks Inc 38 JRR200 Route Reflector Hardware Guide...
Страница 64: ...Copyright 2018 Juniper Networks Inc 64 JRR200 Route Reflector Hardware Guide...
Страница 74: ...Copyright 2018 Juniper Networks Inc 74 JRR200 Route Reflector Hardware Guide...