
CHAPTER 13
Powering On and Initially Configuring the CTP151
Device
IN THIS CHAPTER
Powering On the CTP151 Device | 75
Bringing Up the CTP151 with CTPOS on Internal SSD | 76
Configuring the First Boot Script for the CTP151 Device | 77
Powering Off the CTP151 Device | 80
Powering On the CTP151 Device
In this procedure we assume that the device is already connected to a power source.
For specifications on the electrical requirements for the device, see
“CTP151 Platform Chassis Physical
.
CAUTION:
Evaluate the overall loading of the branch circuit before you install any
equipment into a rack.
To power on the device:
1. Verify that the power source is operational.
2. Inspect all grounding and power connections to the device chassis.
3. Confirm that all cable connections are secure.
4. Switch any available power switches to ON.
5. Monitor the console to verify that the device is booting up properly.
75
Содержание CTP151 Platform
Страница 1: ...Juniper Networks CTP151 Circuit to Packet Platform Hardware Guide Published 2020 02 07...
Страница 12: ...1 PART Overview CTP151 Platform Overview 3 CTP151 Interface Modules 9...
Страница 13: ......
Страница 25: ...2 PART Planning System Specifications 17 Planning and Preparing the Site 19 Cable and Pinout Specifications 27...
Страница 26: ......
Страница 50: ......
Страница 57: ...4 PART Installation Unpacking and Mounting the CTP151 Device 51 Installing Modules 57 Cabling 65...
Страница 58: ......
Страница 71: ...CTP151 Platform Overview 3 63...
Страница 78: ......
Страница 88: ......
Страница 100: ...7 PART Troubleshooting Troubleshooting Hardware and Power Failures 97...
Страница 101: ......