C Transportation and commissioning
1
Transportation by crane
m
Only use lifting gear of adequate capacity
(loading weight
=
dead weight
+
battery weight;
see truck identification plate).
A
Lifting points (1) are provided or loading the truck by means of crane gear. The lifting
points are covered by plastic covers that must be re-inserted after transport.
– Park the truck and render it safe
(see chapter E).
– Attach the crane gear to the lifting eye
(1).
m
The crane gear must be attached to the
lifting eye in such a manner that it
cannot slip!
The crane gear must be attached in
such a manner that it does not touch
any attachments during lifting.
2
Commissioning
m
The truck must only be operated on bat-
tery current! Cables connected to the
battery (trailing cables) must be less
than 6 m in length.
To prepare the truck for operation after delivery or transportation, the following ope-
rations must be performed:
– Check the equipment for completeness.
– If necessary, install the battery. Make sure that the battery cable is not damaged.
– Charge the battery (see chapter D).
– Put the truck into operation in the stipulated manner (see chapter E).
A
When the truck is parked, the surface of the tyres may flatten. The flattening will dis-
appear after the truck has been operated for a short time.
C 1
0301
.GB
C Transportation and commissioning
1
Transportation by crane
m
Only use lifting gear of adequate capacity
(loading weight
=
dead weight
+
battery weight;
see truck identification plate).
A
Lifting points (1) are provided or loading the truck by means of crane gear. The lifting
points are covered by plastic covers that must be re-inserted after transport.
– Park the truck and render it safe
(see chapter E).
– Attach the crane gear to the lifting eye
(1).
m
The crane gear must be attached to the
lifting eye in such a manner that it
cannot slip!
The crane gear must be attached in
such a manner that it does not touch
any attachments during lifting.
2
Commissioning
m
The truck must only be operated on bat-
tery current! Cables connected to the
battery (trailing cables) must be less
than 6 m in length.
To prepare the truck for operation after delivery or transportation, the following ope-
rations must be performed:
– Check the equipment for completeness.
– If necessary, install the battery. Make sure that the battery cable is not damaged.
– Charge the battery (see chapter D).
– Put the truck into operation in the stipulated manner (see chapter E).
A
When the truck is parked, the surface of the tyres may flatten. The flattening will dis-
appear after the truck has been operated for a short time.
Содержание EME 112
Страница 1: ...Operating instructions 77800386 EME 112 G 05 00 07 08 ...
Страница 3: ...0108 GB 0108 GB ...
Страница 7: ...0506 GB 2 0506 GB 2 ...
Страница 9: ...0600 GB A 2 0600 GB A 2 ...
Страница 25: ...1001 GB D 6 1001 GB D 6 ...
Страница 28: ...E 3 0301 GB 5 2 1 4 3 6 7 8 9 10 E 3 0301 GB 5 2 1 4 3 6 7 8 9 10 ...
Страница 35: ...0301 GB E 10 0301 GB E 10 ...
Страница 47: ......
Страница 65: ...0506 GB 18 0506 GB 18 ...