Twin operation
Requirements
– To prepare the truck for operation, see page 86
Procedure
• To lower the load handler and tilt the mast forward
at the same time, push the Multi Pilot forward and
to the right.
• To lift the load handler and tilt the mast back at the
same time, push the Multi Pilot back and to the left.
• To lower the load handler and tilt the mast back at the same time, push the Multi
Pilot forward and to the left.
The mast is now tilted back / forward.
Positioning the integrated sideshifter (option)
Requirements
– Truck prepared for operation, see page 86.
Procedure
• Press the (128) button to move the load
handler to the right (from the driver's
viewpoint).
• Press the (127) button to move the load
handler to the left (from the driver's
viewpoint).
The sideshifter is now positioned.
128
127
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically to
neutral.
106
10.20 en-GB
Содержание EFG 110
Страница 1: ...EFG 110 115 10 09 Operating instructions 51151449 10 20 en GB EFG 110k EFG 110 EFG 113 EFG 115 ...
Страница 2: ...2 ...
Страница 4: ...4 10 20 en GB ...
Страница 10: ...10 10 20 en GB ...
Страница 23: ...Ast a 2 e a 2 W a c Q h 6 h 7 H 1 h 1 h 3 h 4 h 2 m 1 b L2 L1 y m 2 h 10 x 23 10 20 en GB ...
Страница 38: ...38 10 20 en GB ...
Страница 46: ...46 10 20 en GB ...
Страница 56: ...The battery is now charged 56 10 20 en GB ...
Страница 58: ...58 10 20 en GB ...
Страница 63: ...72 71 73 69 74 75 70 69 68 67 66 64 65 63 63 10 20 en GB ...
Страница 65: ...80 77 76 79 72 71 65 10 20 en GB ...
Страница 172: ...172 10 20 en GB ...