background image

3

--Orchard,tea garden operation and farmland rotary tillage operation requirements are different, the

selection of different cutting tools and operation speed can meet the functional requirements.

At present, it has obtained one national invention patent and seven new utility patents. The appearance of
the machine provides an advanced and applicable model for the farmland operation in southern China and
mountainous and hilly areas. It greatly improves the working mode of farmers, reduces the labor intensity
and improves the labor efficiency. It will play an active role in China's agricultural production.

Part 2: Structure and specifications

1 Guide wheel 2 Mudguard 3 Diesel engine 4 Belt

5 Clutch assembly 6 Belt cover 7 Upper shield 8 Front gear

cover 9 Tool controller 10 Speed controller 11 Clutch

controller 12 Armrest 13 Steering handle 14 Seat assembly

15 Traction seat 16 Transmission 17 Travel shaft 18 Power

frame 19 Tool rest assembly 20 Tool shaft 21 Starting

battery 22 Starting motor

Part 3 Main technical specifications

No.

Specification

Parameter

Remark

1

Rated Power (Kw)

5.15-9.0

Mating power supply

2

Overall dimension (mm)

2100*800*1150

L*W*H

3

Working range (cm)

800-500

4

Min.turning radius (M)

0.5

5

Min.swinging radius (M)

2.4

Содержание 3TG-8Z Series

Страница 1: ...gong Machinery Ingenious workmanship One machine in hand no worries about farming CHENGDU JUN YI SHU INTERNATIONAL TRADE CO LTD Add Room 3326 33rd Fl Building 10 No 299 West Chenghua Street Jinniu District Chengdu China Tel 86 158 2832 6490 E mail davis ai junyishu com ...

Страница 2: ...ical specifications 3 Part 4 Field management machine adjustment 5 Part 5 Installation of wheels and tools 7 Part 6 Applications 9 Part 7 Maintenance 11 Part 8 Fault analysis and troubleshooting 12 Part 9 Accessories and implements 13 Part 10 General rules of warranty policy terms and conditions 15 ...

Страница 3: ...has multiple functions and perfect functions The walking part of the machine has six forward gears and two reverse gears The traveling axle is hexagonal which is convenient for installation Walking wheels can be selected according to different operation requirements paddy wheel dry land wheel multi purpose wheel cultivation wheel and rubber wheel The front output shaft of the machine has positive ...

Страница 4: ... the labor efficiency It will play an active role in China s agricultural production Part 2 Structure and specifications 1 Guide wheel 2 Mudguard 3 Diesel engine 4 Belt 5 Clutch assembly 6 Belt cover 7 Upper shield 8 Front gear cover 9 Tool controller 10 Speed controller 11 Clutch controller 12 Armrest 13 Steering handle 14 Seat assembly 15 Traction seat 16 Transmission 17 Travel shaft 18 Power fr...

Страница 5: ...ture of each tool has different requirements The parameters here are only for reference Max rotating radius mm 153 Total number of blades 24 Number of rotary cutting surfaces 8 Number of blade in each rotary cutting surface 3 Spacing of each adjacent cutting surface mm 40 13 Specification Parameter 13 Transmission Operating mode Front rotary tilling ditching earthing up rear ridging Power output s...

Страница 6: ...3 Throttle strut 4 Screw bolt nut 5 Speed control handle 2 V belt adjustment Loosen the bolts of the fixed adjustment bracket 1 adjust the screw rod 2 on both sides of the power frame to move the engine position forward or backward tighten the tension by pressing four fingers in the middle part of the belt about 5kg force and the belt is bent about 2cm or so Both sides of the adjusting screw rod 2...

Страница 7: ...tch handle 1 in the clutch limit frame be 10 15mm 1 Clutch handle 2 Clutch cable 3 Clutch adjusting fork and lock nut 4 Steering handle adjustment 1 Steering handle 2 Pin shaft and split pin 3 Steering cable 4 Steering adjusting fork When adjusting the steering handle loosen the pin shaft and split pin 2 and withdraw the steering cable 3 from the steering handle 1 If it does not separate rotate th...

Страница 8: ...d be adjusted to ensure the normal operation of the machine See 1 3 4 item adjustment method for adjustment method 1 Right armrest 2 Cross bar 3 Cross bar bolt 4 Left armrest 5 Upper shield 8 Adjusting hole position 7 Bolt A 6 Bolt B Part 5 Installation of wheels and tools 1 Installation of wheels 1 Hexagonal sleeve of wheel 2 Locking bolt 3 Transmission travel shaft 4 Pin shaft 5 R Pin The wheels...

Страница 9: ... body After the tool shaft sleeve is inserted into the tool shaft the two holes are aligned and then the pin shaft is inserted and finally fixed with r pin or split pin Paddy field rotary tillage roller blade Hard field rotary tillage deep ploughing hoe Dry land rotary tillage dry land blade Front ridging Ditching ditching blade Ridging ridging blade ...

Страница 10: ...nnecting bolts and nuts of all parts 2 Add fuel oil lubricating oil and water 3 Check and adjust the tension of V belt 2 Running in method 1 Under no load condition each gear is running in for 0 5 hours 2 Under the condition of 1 3 rated load rotary tillage depth 5 6cm each gear is running in for 1 hour 3 Under the condition of 2 3 rated load rotary tillage depth 8 10cm the running in of each gear...

Страница 11: ...dle to the on position and the machine can start to work Check whether the left and right steering gears are engaged Inspection method if you do not hold the steering handle and swing the armrest to the left and right it means that the steering gear teeth are engaged 3 Shift gears Pull the clutch handle to the off position and move the shift lever to the required gear When shifting pay attention t...

Страница 12: ...stem 3 Three level maintenance every 500 hours 1 Complete the first level maintenance 2 Check the V belt for wear and replace if necessary 3 Remove the clutch and check its wear If there is oil clean it with gasoline or kerosene and replace the friction plate if necessary 4 Clean the gearbox and change the lubricating oil 4 Technical maintenance every 1500 2000 hours Remove all parts and clean the...

Страница 13: ... lubricating oil does not meet the requirements 5 There are burrs on the surface and end face of gear teeth 1 Replacement 2 Replacement 3 Replacement 4 Add oil or replace standard lubricating oil 5 Deburring 3 Incomplete clutch separation The free stroke of clutch control system is too large Readjust free travel 4 Difficult to put into gear 1 There are burr on the end face of gear or spline hole 2...

Страница 14: ...sly worn 1 Just drive for a while 2 Adjust free stroke 3 Replace the steering fork 9 Automatic steering 1 Steering rod too short 2 Weak or damaged steering spring force 3 Serious wear or damage of gear teeth 1 Readjustment 2 Replace the steering spring 3 Replace the gear or adjust and install the left and right steering gears Part 9 Accessories and implements Paddy field wheel Cultivator wheel Mul...

Страница 15: ...14 φ450 Ditching blades φ350 Ditching blades Front ridging blades Seed and fertilizer spreader Deflection plow Ridger ridging blade Trailer Plough coulter Harrow Seat ...

Страница 16: ...tances it is not within the scope of Warranty and the company will charge for repair 1 Early wear and failure caused by improper use repair and maintenance 2 Failure caused by components and parts that are not allowed to be refitted adjusted and disassembled according to the product manual 3 Machine damage caused by the user s violation of the operating procedures 4 There is no three guarantee cer...

Отзывы: