– 8 –
Adjust so that the right-hand end of the
elactic band
meets
the left-hand side of collar
❺
of the front roller and collar
❸
of the intermediate roller when putting straight the elac
-
tic band on the front roller. Adjust in accordance with the
procedure below.
1) Loosen two screws
❶
, adjust elactic band guide
❹
to
the elactic band width, and tighten two screws
❶
.
2) Loosen screw
❷
, adjust collar
❺
to the position of the
right-hand end of elactic band, and tighten screw
❷
.
3) Loosen screw
❻
in collar
❸
of the intermediate roller,
and move collar
❸
to the right or left in accordance
with the elactic band width. At this time, make sure that
the elactic band is put straight. Then tighten screw
❻
.
Do not excessively tighten screws
❶
and
❻
.
Deformation of collars will be caused.
11. ADJUSTING PROCEDURE OF THE POSITION OF THE TENSION ROLLER
(1) Adjusting the lateral position
❹
❶
❷
❺
Elactic band
❻
❺
❸
(2) Adjusting the vertical position and longitudinal position of the tension roller
Loosen clamp lever
❶
and screw
❷
. Adjust the height
and longitudinal position of the front roller.
After the adjustment, tighten clamp lever
❶
and screw
❷
.
❶
❷
WARNING :
To protect against possible personal injury due to abrupt start of the machine, be sure to start the follow-
ing work after turning the power off and ascertaining that the motor is at rest.
Contact
Содержание MF-7900-E11
Страница 1: ...vi INSTRUCTION MANUAL MF 7900 E11...