– 83 –
(Important) No lubrication is needed for the thread take-up lever.
(Maintenance-free mechanism)
When adjusting the thread take-up lever mechanism, the following items
shall be observed:
Replacement of the thread take-up lever
1. Remove the needle bar
and the needle bar connector
.
2. Draw out the needle bar upper bushing
.
(Cautions) Be careful not to hurt the needle bar upper bushing
.
3. Loosen two main shaft counterbalance setscrews
of the thread
take-up lever support shaft for the main shaft counterbalance
.
(The thread take-up lever support shaft
is processed flat.)
4. Loosen two thread take-up lever support shaft setscrews
.
(The thread take-up lever support shaft
is processed flat.)
5. Remove the thread take-up lever mechanism
6. Replenish the appropriate grease to the needle bearing
of the
thread take-up lever support shaft.
7. Reassembly can be carried out in the reverse order for disassembly.
At that time, however, the items specified below shall be strictly
observed.
8. In the state that the thrust collar
of the thread take-up lever support
shaft is temporarily fastened, insert the thread take-up lever unit to
the position where it comes in contact with the main shaft
counterbalance
.
9. Fix the main shaft counterbalance setscrew
of the thread take-
up lever support shaft.
(Cautions) The first screw in the revolving direction shall be made
to coincide with the flat section of the shaft.
10. Drive the needle bar upper bushing
to install the parts of needle
bar
and needle bar connector
.
11. Eliminate thrust rattling from the thread take-up lever support shaft
and fix the thrust collar
of the thread take-up lever support shaft.
12. Turn the hand wheel by hand several turns in forward direction and
fix the thread take-up lever support shaft
by means of the thread
take-up lever support shaft setscrew
, keeping the needle bar
centering.
(Cautions) 1. Improper centering of the needle bar
causes the
thread take-up lever mechanism to be loaded
inadequately, thus greatly affecting the durability.
2. Coincidence is absolutely needed between the flat
section of the thread take-up lever support shaft
and the screw.
3. After confirming that there is no thrust backlash,
assemble the take-up lever thrust collar
.
o If this section is hurt, this will be a
cause of seizure.
o If there is thrust backlash, this will
be a cause of breakage of the
thread take-up lever.
Adjustment Procedure
Results of Improper Adjustment
Needle bar upper bushing
Remarks
Part No.
23608003
Position: 0.5mm hollow above the
Thread take-up lever
Part No. Thread take-up lever stroke
Standard specification
40037370
110mm
Specification for light-weight materials 40037439
110mm
Specification for heavy-weight materials 40055604
113mm
Содержание DDL-9000A
Страница 14: ... 10 4 Feed locus and phase 1 Timing standard 2 Timing fast 3 Timing slow Standard Adjustment ...
Страница 24: ... 20 7 Lubrication 4 Cleaning of the oil filter DDL 9000A S and DDL 9000A M only Standard Adjustment ...
Страница 32: ... 28 8 Adjustment of the amount of feeding 4 Optional switch Standard Adjustment ...
Страница 56: ... 52 11 Thread trimming unit 5 Adjustment of rise of the second thread tension disc Standard Adjustment ...
Страница 60: ... 56 11 Thread trimming unit 7 Replacement of the moving knife Standard Adjustment ...
Страница 66: ... 62 11 Thread trimming unit 10 Adjustment of the drive arm stopper Standard Adjustment ...
Страница 70: ... 66 12 Adjustment of the wiper DDL 9000A WB OB 2mm 1mm Standard Adjustment ...
Страница 72: ... 68 13 Adjustment of feed lever pressure B A Feed lever Standard Adjustment ...
Страница 112: ...MEMO ...