JUDO MAFI
19
Data sheet
9.4
Installation dimensions
A = Fitting length
B = Unit width
C = Height above pipe centre
D = Height below pipe centre
E = Depth to pipe centre
F = Waste water connection centre
to pipe centre
F1 = Distance waste water connection
centres
G = Connection dimension waste water
9.5
Scope of supply
– Pre-mounted magnetite filter
– Installation and operating instructions
9.6
Accessories
–
Heating resupply station JHF-F PLUS
(order no. 8060080)
The JUDO HEIFI-FÜL PLUS heating resup-
ply station consists of two integrated shut-off
valves, pressure regulator, manometer and
pipe disconnector, type BA. The integrated
pressure regulator ensures that the pres-
sure in the system remains constant and,
should this drop, then a top up with water is
effected automatically.
Fig. 9 :
Installation dimensions JMFI
¾" - 1¼"
Model
A
B
C
D
E
F
G
JMFI ¾"
180 116 141 227 131 82 15
JMFI 1"
195 116 141 227 131 82 15
JMFI 1¼" 230 116 141 227 136 87 15
All dimensions in [mm] (see fig. 9)
Fig. 10 :
Installation dimensions
JMFI
1½"
Model
A
B
C
D
E
F
F1 G
JMFI 1½" 252 296 141 227 209 151 180 15
All dimensions in [mm]
Содержание JMFI 1
Страница 20: ...20 JUDO MAFI Spare parts 10 Spare parts 1 3 4 5 2 6 7 8 8 8 9 10 11 11 12 13 15 16 17 18 14...
Страница 22: ...22 JUDO MAFI Notes...
Страница 23: ...JUDO MAFI 23 Notes...