Installation by a technical service provider
3.5.3 Installing JJD 10 - 25
The dosing pump is placed directly on the
mineral solution container. The water meter
is installed separately on the installation
rotary flange (see Figure 10).
Fig. 10:
Installation JJD 10 - 25
The water meter for JJD 25 differs from
the illustration.
Do not undo the screws on the water
meter!
Procedure:
1.
Insert the heads of the four flange
screws of the water meter through the
bayonet holes on the rotary flange fit-
Fig. 11:
Place and engage
1
Feed screws through
2
Turn clockwise to engage
2.
Turn the water meter in a clockwise
direction up to the stop (see Figure 11
and Figure 12).
Fig. 12:
Connection engaged
3.
Tighten the four flange screws.
UNIT
Select the tightening torque
(approx. 4 Nm) so that the seal
is effective and the device is not
damaged or strained!
4.
Unscrew the cover of the JUL mineral
solution container and remove the seal
with a sharp knife.
5.
Insert the pump head in the opening of
the mineral solution container and place
the pump housing down on the mineral
solution container.