background image

 

 

 

 

Installation and operating instructions: JUDO FERROCLEAN sludge separator JFS 

2 ½” – 8”

 

All rights reserved. 

JUDO Wasseraufbereitung GmbH 

© JUDO Wasseraufbereitung GmbH 

Postfach 380 

 D-71351 Winnenden 

Translation into foreign languages and reproduction, even in excerpt form, is only permitted with special 
approval. 

Tel. +49 (0)7195-692-0 

 Fax +49 (0)7195-692-188 

Revision level: 20.04.2017 

E-Mail[email protected] 

 judo.eu 

6  

 

 

1.3 

Application 

 
In closed heating and cooling systems, sludge deposits from magnetite (Fe3O4) can lead to faults in 
individual system components, massive power losses or even complete system failures. With a JUDO 
FERROCLEAN sludge separator system sludge deposits can be deposited and rinsed out and thus, for 
example, plate exchangers, tube bundles, air heaters or other system components can be effectively 
protected.  
High oxygen concentrations are also possible in closed heating and cooling systems. Weak points, e.g. non-
diffusion-tight plastic pipes, allow permanent penetration of oxygen (O

2

). Surface corrosion occurs in 

connection with water, which leads to a continuous material removal. The intensity of the surface corrosion 
depends mainly on the oxygen content and time. Silted systems are not only susceptible to faults, but also 

work with massively reduced efficiencies. The quality of the system water in silted plants is often unstable 
and moves mostly at the limits of the required values at badly blended points. This leads to local, 
respectively, selective corrosion (pitting) and the feared breakthroughs. Sludge deposits strongly affect the 
heat transfer. Although the performance data of e.g. heat exchangers constantly deteriorate, the negative 
effects are often recognized very late.   

1.3.1 

New constructions und restorations 

 
New constructions: 
For larger new systems, it is useful to use a JUDO FERROCLEAN sludge separator from the outset. Thanks 
to the simple operation, it is possible to check the system water quality at any time and to determine, with the 
help of the magnets and the magnesium anode, whether the system corrodes. Continuous corrosion is 
prevented and no sludge can settle. 

 
Restorations: 
In the case of refurbishments, a water analysis and accurate inventory of the hydraulic system should be 
carried out beforehand. As a result, the correct installation location for the JUDO FERROCLEAN sludge 
separator can then be determined. Depending on the system, it may be useful to plan several small models 
decentrally. For large systems with floor heating systems, e.g. residential settlements or residential buildings 
with central heat generation, JUDO FERROCLEAN sludge separators are installed at the substations, e.g. 
decentrally. In the case of cooling systems, the installation location is usually selected in the main mass flow 
in the control center. 

 
 
 
 

 
 
 
 

Содержание FERROCLEAN

Страница 1: ...into foreign languages and reproduction even in excerpt form is only permitted with special approval Tel 49 0 7195 692 0 Fax 49 0 7195 692 188 Revision level 20 04 2017 E Mail info judo eu judo eu Pa...

Страница 2: ...Symbols and their meaning 9 2 3 1 Hazard notes in the installation and operating instructions 9 2 3 2 Hazard notes on the sludge separator 9 2 3 3 General notes 9 2 3 4 Personal protective equipment 9...

Страница 3: ...g GmbH Postfach 380 D 71351 Winnenden Translation into foreign languages and reproduction even in excerpt form is only permitted with special approval Tel 49 0 7195 692 0 Fax 49 0 7195 692 188 Revisio...

Страница 4: ...Therefore we kindly ask that if you have any questions concerning your JUDO FERROCLEAN sludge separator or if you have any general questions concerning water treatment then please contact our field s...

Страница 5: ...lation operating instructions and the legal regulations applicable in the country and place of use in respect of accident prevention the recognised technical regulations for safe and professional work...

Страница 6: ...ality of the system water in silted plants is often unstable and moves mostly at the limits of the required values at badly blended points This leads to local respectively selective corrosion pitting...

Страница 7: ...Percentage of dissolved iron total iron Possible degree of hardness 1 4 Warranty The warranty is valid in accordance with our general terms of sale and delivery only if The JUDO sludge separator is us...

Страница 8: ...and maintenance work at the prescribed time intervals Attention Other uses are not compliant with the intended use and not permitted JUDO Wasseraufbereitung GmbH will not be responsible for the resul...

Страница 9: ...Warning Danger due to hot surfaces or danger due to scalding Warning Danger due to magnetic field Attention Risk of malfunctions or damage Tab 2 Hazard notes in the installation and operating instruct...

Страница 10: ...instructions do not take into account Random happenings and events that may occur during installation operating and maintenance Location related safety conditions for the observance of which the opera...

Страница 11: ...nd the overall system of the JUDO sludge separator and its environment 2 5 Transport storage disposal Attention Transport the JUDO sludge separator with care in an upright position do not knock over d...

Страница 12: ...y assembled Damage caused by transport must be reported inside 24 hours otherwise no damage claims can be settled for insurance reasons 3 2 Function description The high performance magnets of the JUD...

Страница 13: ...7195 692 0 Fax 49 0 7195 692 188 Revision level 20 04 2017 E Mail info judo eu judo eu 13 3 3 Product overview Fig 1 Overview Fig 2 With insulation 1 Base plate of the support legs 8 Bleeding device 2...

Страница 14: ...130 Mechanical hydraulic data Nominal diameter 2 3 4 5 6 8 Flush water connection inlet IG Sludge connection to sewer 1 IG Max permissible operating pressure bar 16 Ventilation effect up to max bar 1...

Страница 15: ...692 0 Fax 49 0 7195 692 188 Revision level 20 04 2017 E Mail info judo eu judo eu 15 3 4 2 Dimensions Fig 3 Dimensions Model A B C D E F G H I J K JFS 2 575 435 349 655 295 416 1026 1143 500 273 373...

Страница 16: ...the place of installation An on site bypass bypass with on site shut off valve is provided in order to avoid interruptions in operation of the system during maintenance and repair work on the JUDO FER...

Страница 17: ...ing commercially available valves and fittings The pipelines on the customer s site must be mechanically stress free and the connections must be mechanically stress free and sealed Shut off valves mus...

Страница 18: ...aufbereitung GmbH Postfach 380 D 71351 Winnenden Translation into foreign languages and reproduction even in excerpt form is only permitted with special approval Tel 49 0 7195 692 0 Fax 49 0 7195 692...

Страница 19: ...stallation acc to DIN EN 1591 4 The JUDO FERROCLEAN sludge separator can be installed in the flow or return of the system the flow direction is freely selectable Mounting means are not included in the...

Страница 20: ...e to the JUDO FERROCLEAN sludge separator as well as its system components is present the JUDO FERROCLEAN sludge separator is properly integrated in the installation all connections are checked for le...

Страница 21: ...hut off valve onsite 6 Magnesium anode 3 Flushing water shut off valve 7 Sludge shut off ball valve 4 Bleeding shut off valve 8 Magnetic rods 5 3 1 Flushing process with fresh water Switch off the on...

Страница 22: ...8 out up to the base plate of the support legs Open the sludge shut off valve 7 Switch on the onsite circulation pump or close the onsite shut off valve in the bypass Flush out sludge until clear wate...

Страница 23: ...5 3 2 Cluse the sludge shut off valve 7 after flushing Close the onsite shut off valve 1 2 on the inlet and outlet side of the JUDO FERROCLEAN sludge separator Open the on site shut off valve in the...

Страница 24: ...on the degree of consumption The magnetic rods should be checked at regular intervals for correct insertion 6 1 Replacing the magnesium anode Switch off the on site circulation pump or open the on sit...

Страница 25: ...erpt form is only permitted with special approval Tel 49 0 7195 692 0 Fax 49 0 7195 692 188 Revision level 20 04 2017 E Mail info judo eu judo eu 25 6 4 Transfer confirmation and maintenance log The a...

Страница 26: ...FERROCLEAN sludge separator Order number Manufacturing number Model JFS 2 JFS 3 JFS 4 JFS 5 JFS 6 JFS 8 Accessories JUDO insulation Local circumstances Application area Cooling system Heating system...

Страница 27: ...ne Mobile JUDO FERROCLEAN sludge separator Order number Manufacturing number Model JFS 2 JFS 3 JFS 4 JFS 5 JFS 6 JFS 8 Activities performed Leak check Bleeding shut off valve Bleeding device Flushing...

Отзывы: