JUDO JUKOMAT-LongLife
11
Installation
ATTENTION
(see chapter “Safety information and dan-
gers due to non-compliance”)
The section of the profiled flange gasket
must point towards the built-in rotary flange.
Failure to observe this can lead to leaks and
water escaping. This can in turn cause water
damage to the house and its installations
(see Fig. 4).
4.2
Discharging the backwashing
water
ATTENTION
(see chapter “Safety information and dan-
gers due to non-compliance”)
An adequately dimensioned wastewater
connection (e.g. floor drain) to DIN 1986
must be available for the backwashing wa-
ter.
The dimensioning depends on the local cir-
cumstances (e.g. wastewater pipe gradient,
number of pipe bends, length of the waste-
water pipe, etc.). The dimensioning must at
least allow all the wastewater to be dis-
charged at the same time.
If it is not possible to provide a wastewater
connection directly beneath the Domestic
Water station, the flushing water can be fed
several metres to the next wastewater con-
nection, either through a hose or a pipe to be
fitted to the flushing water valve. This pipe
must have the same dimension as the flush-
ing water valve.
In all options, a free discharge must be en-
sured in accordance with EN 1717.
Fig. 4:
Built-in rotary flange
Profiled flange gasket
Ensure that the wastewater con-
nection functions before plug-
ging the power supply unit into
the socket.
Содержание 8170238
Страница 3: ...JUDO JUKOMAT LongLife 3...
Страница 21: ...JUDO JUKOMAT LongLife 21 Notes Notes...
Страница 26: ...26 JUDO JUKOMAT LongLife Spare Parts 10 Spare Parts 10 1 JUKO LF A 1...
Страница 29: ...JUDO JUKOMAT LongLife 29 Spare Parts 10 2 JUKO LF A 1 2...