
003-001 PowerAssist Installation
Page 2 of 24
Rev. 0–27APR07
Table of Contents
INTRODUCTION: HOW THE SYSTEM WORKS
..................................................................................................3
SSIST WITH EXISTING RIGGING EQUIPMENT
...................................................................................4
NSTALL THE COUNTERWEIGHT RIGGING HARDWARE
.............................................................................................9
NCHOR THE HOIST TO THE BUILDING STRUCTURE
..............................................................................................10
NERGIZE THE HOIST AND VERIFY OPERATION
TTACH THE DRIVE CHAIN TO THE DRIVE CABLE
.................................................................................................14
NSTALL THE DRIVE CHAIN INTO THE HOIST
TTACH THE DRIVE CHAIN TO THE UNDERSIDE OF THE ARBOR
.............................................................................15
DJUST THE COUNTERWEIGHT AND TENSION THE DRIVE CHAIN
...........................................................................16
NSTALL ARBOR WEIGHT WARNING SIGNS
HAIN TENSION ADJUSTMENT AFTER BREAK IN
..................................................................................................17
OPERATING AND MAINTAINING THE POWERASSIST
.................................................................................18
APPENDIX A: ROTARY LIMIT SWITCHES
APPENDIX B: STRIPPING COATED CABLE