The front shock in packing situation is as below picture about.
1- Remove pin, nut, adjusted cushion from the
bolt on the tie rod.
2- Insert the bolt on the tie rod into the hole on
the front wheel axle.
3- Tighten the nut, insert the pin, then lock the
pin.
4- Put the upper hole of the front shock into
the groove on the frame.
5- Insert the bolt though the hole on the
groove and the hole on the front shock.
(Notice; one cushion on one side
of hole on the front shock.)
6- Tighten the nut.
ATTACH FRONT SHOCK
Содержание Dirt Devil 250 2004
Страница 1: ......
Страница 2: ......
Страница 3: ...CONTENTS...
Страница 18: ...OPERATION Component locations Figure 3...
Страница 27: ...WIRING DIAGRAM...
Страница 34: ...4 Crankcase comp No P N ENGLISH Qty 25 SZ04006000 O ring 9x1 7 2 26 SZ04080002 1 27 440601621 Bolt M6x16 3...
Страница 44: ...14 Carburetor comp No P N ENGLISH Qty 1 SZ16000007 Carburetor COMP 1...
Страница 60: ...10 REVERSE GEAR...
Страница 74: ...ATTACH MIRROR...
Страница 77: ...ATTACH SEAT 1C Figure 2 Figure 1 Figure 3 Figure 4...
Страница 81: ...PREPARATION INSTRUCTIONS FOR THE GO CART Packing situation for SZ250DL Front of packing Rear of packing...
Страница 82: ...THE WHOLE GO KART LOOKS Front review Side Review Back Review Upper Review...