OPERATION
reverse gear box. Make sure the shift lever can be on the three positions (F, N, R) cleanly. Then tighten
the nuts 1, 2.
F. Parking Adjustment
a.
Press down the reverse lever to the ”F”
position so that the unit can move forward, pull
back the lever to “P” so that the unit can Parking.
(See
Fig. 6 )
b.
Adjust Nut #1 on the top of the reverse cable
can adjust the mesh status inside reverse gear
box, Turn half a round as you rotate the nut to
adjust the cable. Make sure cable is not too tight or
loose. Adjust Nut #2 accordingly to adjustment of
Nut #1.
Figure 6
Содержание Dirt Devil 250 2004
Страница 1: ......
Страница 2: ......
Страница 3: ...CONTENTS...
Страница 18: ...OPERATION Component locations Figure 3...
Страница 27: ...WIRING DIAGRAM...
Страница 34: ...4 Crankcase comp No P N ENGLISH Qty 25 SZ04006000 O ring 9x1 7 2 26 SZ04080002 1 27 440601621 Bolt M6x16 3...
Страница 44: ...14 Carburetor comp No P N ENGLISH Qty 1 SZ16000007 Carburetor COMP 1...
Страница 60: ...10 REVERSE GEAR...
Страница 74: ...ATTACH MIRROR...
Страница 77: ...ATTACH SEAT 1C Figure 2 Figure 1 Figure 3 Figure 4...
Страница 81: ...PREPARATION INSTRUCTIONS FOR THE GO CART Packing situation for SZ250DL Front of packing Rear of packing...
Страница 82: ...THE WHOLE GO KART LOOKS Front review Side Review Back Review Upper Review...