4. Installer Information
Installation Guide for Qualified
Personnel
NOTE:
This appliance is factory pre-set for Natural Gas
(G25) fuel only as specified on the appliance Data Plate
and shipping label.
Fixing
The GF 400 BF CE2 is designed as a freestanding
appliance and as such does not require additional fixing.
Requirements for Floor Plate
The appliance may stand on a wooden floor. A floor plate
of non-combustible material is required if the appliance
is to be placed on carpet, vinyl, linoleum or other
combustible material. Minimum dimensions of the floor
plate: 686 x 356mm as in fig. 2. Jøtul can supply floor
plates in a variety of colors.
Firewall Requirements
The appliance may be placed directly against a wall made
of combustible material with the clearances specified
in fig. 3. Make sure there is adequate space for the vent
system behind the appliance and for the full height/
length of the pipe.
Position of Appliance
Minimum clearances are as follows: See Figs. 3 - 6.
Clearance from wall to rear of appliance -
100mm
Clearance from wall to side of appliance -
100mm
Minimum clearance from top of appliance
to register plate -
380mm
Minimum clearance from top of appliance
to combustible shelf, -
600mm
Flue System Installation
Note! During the installation of the vent, it is important
to adhere to national and local regulations that apply.
The system must only be installed with a vent system
approved by Jøtul. Only one single stove may be
connected to the vent system.
The vent system must terminate outdoors.
The vent system is a balanced system: 100% of the
combustion air is supplied from outside the house and
all exhaust gas is returned to outside the house. The
vent pipe is a coaxial pipe in which the combustion air
is supplied through the outer pipe and the exhaust gas
returned through the inner pipe.
Minimum Vent System Clearances to
Combustible Materials
Horizontal Vent Pipe:
From the top of the vent pipe
50 mm
From the side and bottom of the vent pipe
25 mm
Vertical Vent Pipe:
From all sides of the vent pipe
25 mm
Position of Vent Pipe
:
Under porch, covered entrance, story or balcony, that
have at least two open sides under the floor
300 mm
To window or door that can be opened
300 mm
To permanently closed window, recommended to avoid
condensation on the surface
300 mm
From vent to roof soffit
300 mm
Alcove Installation
Maximum Alcove Depth:
63.5 cm*
Minimum Alcove Width:
85.7 cm*
Minimum Ceiling Height from floor:
155 cm
With Short Legs (6”) :
150 cm
* Alcove dimensions result from specific test
configurations, not stove clearance specifications.