Jolywood HD120N Скачать руководство пользователя страница 13

5.2.5   Grounding

5.2.5.1

13

Jolywood (Taizhou) Solar Technology Co.,Ltd.

Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China

www.jolywood.cn

 [email protected]

 +86-523-8061 2361

Installation Manual

 - Jolywood N-type Mono-crystalline Double Glass Module

5.2.5.2

Module  could  be  grounded  with  a  grounding 
equipment listed by a third party. The equipment 
must  be  installed  in  accordance  with  the 
instructions  given  by  the  grounded  equipment 
manufacturer.

JW-HD144N/P modules can also be installed with 

flat  single  axis  tracker.  The  specific  installation 

methods are as follows:

All module frames and brackets must be properly 
grounded  in  accordance  with  the  appropriate 
National  Electrical  Code.  The  grounding 
conductor or grounding wire could be made with 
copper,  copper  alloy  or  other  material,  which 
should  also  be  in  accordance  with  the 
requirements of corresponding National Electrical 
Code.  The  grounding  conductor  must  be 
connected  to  the  ground  through  a  suitable 
grounding methods.

5.2.4   Installation of full frame double 

glass modules (Installation with flat 

single axis tracker)

Use inner four holes  for bolt installation 
C-shaped steel perpendicular to the long frame
maximum test load: front ≤5400Pa  
back ≤2400Pa

 

JW-HD144N/P 

The long frame uses the inner four holes (400mm) 
for bolt installation
maximum test load: front ≤1600Pa  
back ≤1600Pa

 

JW-HD144N/P 

The  long  frame  uses  the  inner  four  holes 
(1300mm) for bolt installation
maximum test load: front ≤2400Pa  
back ≤2400Pa

 

JW-HD144N/P 

Содержание HD120N

Страница 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M6 Double glass module HD120N P HD144N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd...

Страница 2: ...tallation Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Mod...

Страница 3: ...er required relevant professional knowledge and the system must be installed and maintained by quali ed person with professional knowledge Please store this guide in a safe place for future reference...

Страница 4: ...by quali ed person with professional knowledge Persons without authorization and relevant training should not touch modules and approach the installation area or module storage area Do not connect the...

Страница 5: ...irectly on the module during transportation Improper transportation or installation also may damage module which is excluded from the warranty Do not stand climb walk or jump on unpacked pallets of mo...

Страница 6: ...on a relatively at ground to avoid package damage or dumping due to ground deformation or collapse Storage requirements humidity 85 temperature range 40 50 If the modules need long distance transport...

Страница 7: ...rly xed The ground needs to be at enough to ensure package could be placed horizontally and stably Supportive tool should be used when disassembling the carton to prevent the modules from falling down...

Страница 8: ...during installation Do not open the electrical connection or pull out the connector while the circuit is under load Do not touch the modules during installation unless necessary Glass surfaces and bra...

Страница 9: ...e 5 1 9 The application level of module produced by Jolywood is Class A modules with di erent color should be avoided from installed in the same array or roof Mounted with 4 clamps along long frame C...

Страница 10: ...350 30mm maximum test load front 5400Pa back 2400Pa JW HD120N P Mounted with 4 clamps along short frame C shaped steel parallel to the short frame Edge Clamp width 40 50mm height 30mm A 250 30mm maxim...

Страница 11: ...holes on the back of the module frame are installed on the support structure with Mounted with 4 clamps along long frame C shaped steel parallel to the long frame Edge Clamp width 40 50mm height 30mm...

Страница 12: ...a and the recommended torque is 16 Newton m 5 2 3 4 The outer at washer needs to use M8 A2 70 a stainless steel SUS304 at washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the cor...

Страница 13: ...ed in accordance with the appropriate National Electrical Code The grounding conductor or grounding wire could be made with copper copper alloy or other material which should also be in accordance wit...

Страница 14: ...of modules connected wrong may lead to irreparable damage Before modules connected in parallel please check the voltage and polarity of each module array If the polarity of products is opposite or Vo...

Страница 15: ...wn in Figure 2 Connecting modules in series in Parallel by inserting the positive terminal of one module into the negative terminal of the next module The number of modules connected in series or in p...

Страница 16: ...free from damage and rust free ensure that the mountings properly tightened check all cables to make sure they are tight 6 2 3 It is forbidden to use WD 40 or various organic solvents to wipe all part...

Страница 17: ...ules under special weather wind level greater four heavy rain or heavy snow c During cleaning the water pressure on the surface of module glass shall not exceed 4MPa and the module is not allowed to w...

Страница 18: ...ash accumulation there is no obvious scratch on the surface of module No cracking occurs on the surface of module 6 3 3 Troubleshooting If module does not work after installation please notify the ins...

Отзывы: