![Jolly Mec I-DEA2 QUADRA Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/jolly-mec/i-dea2-quadra/i-dea2-quadra_installation-use-and-maintenance-manual_2025711035.webp)
35
ENGLISH
Device cleaning and maintenance schedule chart.
Description
Daily
From 1 to 2
days
Weekly
Monthly
Annually
As
necessary
Stove body cleaning
U
Remove the firebox to
clean it
U
Ash pan removal and
cleaning
U
Fume inspection
cleaning
U
Pellet tank cleaning
U
Glass cleaning
U
Cladding cleaning
U
Remove the flame-
breake
U
Cleaning of the flue
T
Stove fume pass
cleaning
T
Cleaning of any
deposits in the stove
T
Cleaning of fans
T
Check good ignition
resistance operations
T
Check electric/
electronic system
integrity
T
Check safety device,
thermostat and
pressure switch
status and efficiency
T
Check the condition of
the sealing gaskets,
paying special
attention to the one
on the closure of the
combustion chamber
door.
T
Check the condition
of the ceramic glass.
T
Check the pellet
loading gear motor is
working properly.
T
Clean the bottom of
the pellet hopper.
T
KEY:
U: routine maintenance by the customer user
T: extraordinary maintenance by a specialised Technical Service Center
Time between one cleaning and the next is strictly tied to fuel quality and also the device’s operating time. The
most suitable cleaning frequency can only be established a few days after use according to the actual amount of deposited
residue and may vary from the intervals imposed by Jolly Mec.
NOTE
Содержание I-DEA2 QUADRA
Страница 17: ...17 ENGLISH 06 4 DIMENSIONS All measurements are in mm I Dea2 Quadra A 846 B 1153 C 276 I Dea2 Quadra C A B ...
Страница 37: ...37 ENGLISH NOTES ...
Страница 38: ...38 ...
Страница 39: ...39 ENGLISH ...