10
(
1
)
Open the JW3213PON power meter
,
first of all click “connect”
,
connect
JW3213PON power meter to the
computer(Click“English”to set the language
of the operation interface to be English )
(
2
)
choose “Upload Data”
,
click “Upload Test Data”sign
,
the saved data can
be read on the computer, and saved as a file format.
(
3
)
click the“Delete Test Data” button or“Clear Test Data”to delete the data.
Threshold Setting
:
Click
“
Upload threshold value
”
icon to read the threshold.