CONSOLE REPLACEMENT PROCEDURE
(5100series)
Tools required:
u
Philips
screwdriver
Procedure:
1.
Loosen the screws (arrow) from the console using the
screwdriver.
2.
Disconnect the console
cables from the console
connectors.
3.
Replace the console
with a new one and
reconnect the console cable to the connector.
4.
Tighten the screws that hold the console to the bracket.
3-1 Revision: 1.0 Date: 2001/06/01
Содержание JAR-5100
Страница 1: ...o JPB 5100 o JPS 5100 o JAR 6000 o JPC 5100 o JPE 5100 o JAR 5100 ...
Страница 5: ...SECTION 1 WIRING DIAGRAM Revision 1 0 Date 2001 06 01 ...
Страница 11: ...JPC B 5100 WIRING DIAGRAM 1 6 Revision 1 0 Date 2001 06 01 ...
Страница 12: ...JPS 5100 WIRING DIAGRAM 1 7 Revision 1 0 Date 2001 06 01 ...
Страница 13: ...JAR 5100 WIRING DIAGRAM 1 8 Revision 1 0 Date 2001 06 01 ...
Страница 14: ...JPE 5100 WIRING DIAGRAM 1 9 Revision 1 0 Date 2001 06 01 ...
Страница 35: ...SECTION 3 PARTS REPLACEMENT PROCEDURE Revision 1 0 Date 2001 06 01 ...
Страница 72: ...SECTION 4 PREMENTIVE MAINTENANCE Revision 1 0 Date 2001 06 01 ...
Страница 76: ...SECTION 5 SERVICE FORM Revision 1 0 Date 2001 06 01 ...