ON
1 2
3 4
AC Units
network needs to run upon exchanging with another
control system network, it is required to be initialized.
(2) Process for Initialization Operation
Power off the control system.
If firmware of YORK-003 is 1.06 and previous
versions(Suitable for YEWS100/130/170/200/210),
detailed setting methods are shown in following figure:
ON
1 2
3 4
ITS Units
ON
1 2
3 4
HP Units
DIP switch can not be set by anyone except manufacture.
The measuring range of pressure sensor used in AC/ITS
units: 0.41~5.1 Kg/cm2
The measuring range of pressure sensor used in HP units:
0~20.69 Kg/cm2.
If firmware of YORK-003 is 1.07 and last versions,DIP
does not need to set in single system unit(Suitable for
YEWS/100/130/170/200/210/215).
Control system power on.
Press F2 in the main interface of centralized controller to
enter into the
parameter setting interface-1
, turn to the
next upon inputting the password.
Turn to the
parameter setting interface
-16. Please select
the correct
Model
before doing the next operation.
Turn to the
parameter setting interface-17
, and move the
cursor on the line of
CLEAR RECORD
to set all
parameters as
SYS1
or
SYS2
by pressing
8
, and press
√
to
confirm. Move the cursor on the line
CLEAR FAULT
RECORD
to set all parameters as
YES
by pressing
8
, and
press
√
to confirm. Move the cursor on the line of
DEFAULT DATA
to set the parameters as
YES
, press
confirmation key to confirm.
Turn to the
parameter setting interface
-16, and move the
cursor to the line of
SYS1 FLA
and
SYS2 FLA
(only set
SYS1 on the single system) to select the correct
FLA
value
via number
“
0
”
to
“
9
”
. After correct setting, move the
cursor on the line
SYS1 CUR
.
OFFSET
and
SYS2 CUR
.
OFFSET
(only set SYS1 on the single system) of
parameter setting interface
-3 to set the correct value. The
default is 100, which can be set before the unit leaves the
factory. The user and service personnel shall not attempt to
modify the parameter; otherwise the unit may fail to be run
properly.
Control system power off.
Power on again after powering off HMI and control board.
Return to the main interface by pressing
F1
, then press
F1
to enter into
Status display interface
to view the
communication of HMI and control board. The
communication status of centralized controller and control
board will be displayed in
Status display interface
. If it is
displayed in normal, please check the input status of AI and
DI for each module via the display interface, then the
startup can be done after confirmation.
Note: Only select the unit style
“
E
”
on unit
Model setting, example YEWS100HA50E or
YEWS100HA50E-HP.
YEWS-E Water Cooling Screw Chiller/Heat Pump
NOTE
19
Содержание YEWS Series
Страница 79: ...YEWS electrical drawing compressor for 50Hz power 74...
Страница 80: ...YEWS electrical drawing main board YEWS100H 130H 170H 200H 210H for 50Hz power 75...
Страница 81: ...YEWSelectrical drawing main board YEWS215P for 50Hz power 76...
Страница 82: ...77 YEWS electrical drawing Main Board YEWS100P 130P 170P 200P for 50Hz power...
Страница 83: ...YEWS electrical drawing compressor for 60Hz power 78...
Страница 84: ...YEWS electrical drawing main board YEWS100H 130H 170H 200H for 60Hz power 79...
Страница 85: ...YEWS electrical drawing main board YEWS215P for 60Hz power 80...
Страница 86: ...YEWS field connection for 60Hz power 81...
Страница 87: ...Transformer for230V 3P 60Hz Application 82...
Страница 88: ...Form No AP1105 IOM01 1216 EN Supersedes AP1105 IOM01 0316 EN...