background image

CCS Smart Equipment Control Board for Single Packaged Unit (SPU) Controller Installation

Instructions

1

Applications

The new SE-SPU101x controllers replace the 
RTU-100x controllers. All the RTU100x controllers are 
discontinued, including the RTU-1003-0 VAV SPU 
controller. The new SEC product offering provides new 
controller options.

The SE-SPU101x-1 SEC Unit Control Board (UCB) is a 
member of the Smart Equipment Controller (SEC) 
product family. The controller is designed to run a pre-
engineered HVAC zoning application and provide the 
inputs and outputs required for this application.

North American Emissions Compliance

United States

Canada

Installation

Special Tools Needed

wire strippers

small flat-head screwdriver

22 AWG (0.65 mm) 3-conductor, twisted, shielded
cable with a drain wire

Note:

This drain wire is used only to group the

shielded cable. Do not use this drain wire as a
connection to the board.

wire nuts for 22 AWG drain wire

electrical tape

Mounting

The manufacturing facility mounts the controller. All of 
the required power wiring, internal unit sensor wiring, 
and output wiring is completed and tested at the 
factory. The control application required for the specific 
UCB is factory configured and ready for operation.

Wiring

Field Wiring Connections

In addition to power connections, the UCB requires a 
communication bus connection. Address selection is 
required for networking with a CCS Building 
Automation System (BAS).

Power Wiring

The SEC UCB controller is factory wired for 24 VAC 
power. 

This equipment has been tested and found to 
comply with the limits for a Class A digital device 
pursuant to Part 15 of the FCC Rules. These limits 
are designed to provide reasonable protection 
against harmful interference when this equipment is 
operated in a commercial environment. This 
equipment generates, uses, and can radiate radio 
frequency energy and, if not installed and used in 
accordance with the instruction manual, may cause 
harmful interference to radio communications. 
Operation of this equipment in a residential area 
may cause harmful interference, in which case the 
users will be required to correct the interference at 
their own expense.

This Class (A) digital apparatus meets all the 
requirements of the Canadian Interference-Causing 
Equipment Regulations.

Cet appareil numérique de la Classe (A) respecte 
toutes les exigences du Règlement sur le matériel 
brouilleur du Canada.

IMPORTANT:

The 24 VAC power should not be 

shared with other network devices. Sharing power to 
other network devices may cause noise, 
interference, and ground loop problems. You may 
damage the controller by sharing power to other 
devices.

CCS Smart Equipment Control Board for Single Packaged 
Unit (SPU) Controller

Installation Instructions

SE-SPU1011-1, SE-SPU1012-1

Code No. LIT-12011479

Issued June 16, 2015

Содержание SE-SPU101 Series

Страница 1: ... the UCB requires a communication bus connection Address selection is required for networking with a CCS Building Automation System BAS Power Wiring The SEC UCB controller is factory wired for 24 VAC power This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection ag...

Страница 2: ...r with the wire nuts Follow the stripping and connecting procedure in Step 1 through Step 8 Run the cable from the last unit to the location of the System Manager or Zone Coordinator Follow the connection instructions for the System Manger or Zone Coordinator Figure 4 displays an example communication riser 9 Make sure all the SPUs are powered and operating properly Note Be sure you observe polari...

Страница 3: ...ion cable terminations on the SPU controller board Figure 4 shows the VAV SPU controller communication riser Figure 3 VAV SPU Control Board Communication Terminations Communication Cable to Next VAV box Communication Cable to Next VAV box Zone Dampers and Bypass Damper Move the 4 position terminal block from the Thermostat inputs to the FC Bus connection of the communications card ...

Страница 4: ...W G 3 C O ND U CTO R TW ISTED SH IELD ED W IR E W ITH D RAIN System C om m unication B us Zone Communication Bus S 1 S 2 J 8 J 7 J 6 System Bus Zone Bus C O M C O M C O M 24 V O n O f f 2 4 V AC C O M C O M S B S B Z B Z B C O M E O L O N O f f E O L O N S 1 S 2 J 8 J 7 J 6 System Bus Zone Bus C O M C O M C O M 24 V O n O f f 2 4 V AC C O M C O M S B S B Z B Z B C O M E O L O N O f f E O L O N Ter...

Страница 5: ...3 COM AI 4 Monitored Contact To Temperature RH CO2 Sensor Building Pressure Light Sensor Refrigerant Sensor Common Flow To 24VAC BO 3 BO 2 BO 1 BO 4 COM Monitored Contact To Scheduled Item 1 To Scheduled Item 2 To Scheduled Item 3 To Scheduled Item 4 Non CCS HVAC System Universal CV Unit Controller 24V COM Zone Sensor COM AI 1 COM AI 2 1 2 3 4 BO 1 BO 2 BO 3 BO 4 BO 5 C R G Y1 Y2 W1 W2 COM AI 6 CO...

Страница 6: ...ay influence the behavior of the communication bus In addition certain problems can affect the bus in multiple ways and have multiple symptoms which makes the exact diagnosis difficult For example duplicate addresses on the bus can degrade performance make the device go offline or stop communication completely Incomplete Address With the SEC controller for VAV COBP must have the address switch set...

Страница 7: ...d of the zone bus trunk Verify that only the EOL switch at the end of the system bus is set to ON and all other system bus EOL switches are set to OFF Check connections polarity and lengths Verify that communications loops are less than approximately 304 m 1 000 ft total in length If you are using one transformer to power multiple devices verify that the device 24 VAC power connection follows the ...

Страница 8: ...perating 4 to 158 F 20 to 70 C 10 to 90 RH noncondensing Storage 40 to 194 F 40 to 85 C 5 to 95 RH noncondensing Processor RX631 Renesas microcontroller Memory 2 MB internal program flash 32 KB internal E2Data flash 4 MB external serial flash memory Input and Output Capabilities SE SPU1011 1 9 AIs 7 10k RTD 1 0 to 10 VDC 1 24 VAC Voltage Monitor 13 BIs 24 VAC input with contact cleaning circuits 5...

Отзывы: