NCB-FL Routers
NCB-FL Installation
48
IFI Routers/Repeaters Installation & Operation Manual - P/N: 53388:Rev: A1 5/5/09
6.3.3 JNISCAB-5 Power Outlet and EDCO HSP-121 Installation
NCB Series Router Power Supply Requirements
This router re24VDC @ 0.050A nominal and battery backup in accordance with local code
requirements. It can be powered by any regulated, UL 1481 listed, power limited, battery backed
+24 VDC power source.
Installation Procedure
Step 1. Mount a UL50 listed, single gang electrical box in the JNISCAB-5's back box using self
tapping screws provided.
Figure 6.2 Gang Box Installation Diagram
Step 2. Mount the HSP-121 to the box using studs provided.
Figure 6.3 HSP-121 Power Line Protector Installation Diagram
NOTE:
Each router requires a supervised 115 VAC, 60Hz primary power, regulated, UL 1481 listed,
power limited Uninterruptible Power Supply (UPS).