
ROUTMB Installation
ROUTMB Routers
21
IFI Routers/Repeaters Installation & Operation Manual - P/N: 53388:Rev: A1 5/5/09
3.3 ROUTMB Installation
3.3.1 Required Components
•
ROUTMB motherboard.
•
SMX Echelon network transceiver (ordered separately - FTXC, FOXC, or DFXC).
•
A regulated, UL 1481 listed, power limited, battery backed, +24 VDC power supply (+24
VDC @ 0.075 A).
•
JNISCAB-1 enclosure (ordered separately).
3.3.2 Installation Overview
This is the recommended installation order for a ROUTMB:
1. Secure SMX transceiver and wires on router before inserting router into JNISCAB-1.
2. Install router in cabinet.
3. Bind router to the Echelon network.
3.3.3 ROUTMB Power Requirements
The ROUTMB re24 VDC @ 0.075 A nominal and battery backup in accordance with local
code requirements. It can be powered by any regulated, UL 1481 listed, power limited, battery
24 VDC power source. Power connections are made via plug-in screw terminals.