As soon as a unit is received, it should be inspected for possible dam-
age during transit. If damage is evident, the extent of the damage
should be noted on the carrier’s freight bill. A separate request for
inspection by the carrier’s agent should be made in writing. Also, before
installation, the unit should be checked for screws or bolts which may
have loosened in transit. There are no shipping or spacer brackets
which need to be removed from the interior of this unit.

FURNACE LOCATION AND CLEARANCES

The furnace shall be located using the following guidelines:

1.

Where a minimum amount of air intake/vent piping and elbows will
be required.

2.

As centralized with the air distribution as possible.

3.

Where adequate combustion air will be available (particularly
when the appliance is not using outdoor combustion air).

4.

Where it will not interfere with proper air circulation in the confined
space.

Installation in freezing temperatures:

1.

Furnace shall be installed in an area where ventilation facilities
provide for safe limits of ambient temperature under normal oper-
ating conditions.

2.

Do not allow return air temperature to be below 55º F (13° C) for
extended periods. To do so may cause condensation to occur in
the main heat exchanger, leading to premature heat exchanger
failure.

Clearances for access/service:

Ample clearances should be provided to permit easy access to the unit.
The following minimum clearances are recommended:

1.

Twenty-four (24) inches (61 cm) between the front of the furnace
and an adjacent wall or another appliance, when access is
required for servicing and cleaning.

2.

Eighteen (18) inches (46 cm) at the side where access is required
for passage to the front when servicing or for inspection or
replacement of flue/vent connections.

In all cases, accessibility clearances shall take precedence over clear-
ances for combustible materials where accessibility clearances are
greater.

Installation in a residential garage:

A gas-fired furnace for installation in a residential garage must be
installed so the burner(s) and the ignition source are located not less
than 18 inches (46 cm) above the floor, and the furnace must be located
or protected to avoid physical damage by vehicles.

FOR FURNACES INSTALLED IN THE COMMON-

WEALTH OF MASSACHUSETTS ONLY

For all side wall horizontally vented gas fueled equipment installed in
every dwelling, building or structure used in whole or in part for resi-
dential purposes, including those owned or operated by the Com-
monwealth and where the side wall exhaust vent termination is less
than seven (7) feet above finished grade in the area of the venting,
including but not limited to decks and porches, the following require-
ments shall be satisfied:

1.

INSTALLATION OF CARBON MONOXIDE DETECTORS. 

At

the time of installation of the side wall horizontal vented gas
fueled equipment, the installing plumber or gasfitter shall
observe that a hard wired carbon monoxide detector with an
alarm and battery back-up is installed on the floor level where
the gas equipment is to be installed. In addition, the installing
plumber or gasfitter shall observe that a battery operated or
hard wired carbon monoxide detector with an alarm is installed
on each additional level of the dwelling, building or structure
served by the side wall horizontal vented gas fueled equipment.
It shall be the responsibility of the property owner to secure the
services of qualified licensed professionals for the installation of
hard wired carbon monoxide detectors

a.

In the event that the side wall horizontally vented gas
fueled equipment is installed in a crawl space or an attic,
the hard wired carbon monoxide detector with alarm and
battery back-up may be installed on the next adjacent floor
level.

b.

In the event that the requirements of this subdivision can
not be met at the time of completion of installation, the
owner shall have a period of thirty (30) days to comply with
the above requirements; provided, however, that during
said thirty (30) day period, a battery operated carbon mon-
oxide detector with an alarm shall be installed.

2.

APPROVED CARBON MONOXIDE DETECTORS. 

Each car-

bon monoxide detector as required in accordance with the
above provisions shall comply with NFPA 720 and be ANSI/UL
2034 listed and IAS certified.

3.

SIGNAGE. 

A metal or plastic identification plate shall be perma-

nently mounted to the exterior of the building at a minimum
height of eight (8) feet above grade directly in line with the
exhaust vent terminal for the horizontally vented gas fueled
heating appliance or equipment. The sign shall read, in print
size no less than one-half (1/2) inch in size, "

GAS VENT

DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUC-
TIONS

".

4.

INSPECTION. 

The state or local gas inspector of the side wall

horizontally vented gas fueled equipment shall not approve the
installation unless, upon inspection, the inspector observes car-
bon monoxide detectors and signage installed in accordance
with the provisions of 248 CMR 5.08(2)(a)1 through 4.

Improper installation in an ambient below 32ºF (0.0° C) could create
a hazard, resulting in damage, injury or death.

Table 1: 

Unit Clearances to Combustibles (All Dimensions in Inches, and All Surfaces Identified with the Unit in an Upflow Configuration)

Application

Top

Front

Rear

Left Side

Right Side

Flue

Floor/ 

Bottom

Closet

Alcove

Attic

Line 

Contact

In. (cm)

In. (cm)

In. (cm)

In. (cm)

In. (cm)

In. (cm)

Upflow

1 (2.5)

1 (2.5)

0 (0.0)

0 (0.0)

0 (0.0)

6 (15.2)

Combustible

Yes

Yes

Yes

No

Upflow B-Vent

1 (2.5)

1 (2.5)

0 (0.0)

0 (0.0)

0 (0.0)

1 (2.5)

Combustible

Yes

Yes

Yes

No

Downflow

1 (2.5)

1 (2.5)

0 (0.0)

0 (0.0)

0 (0.0)

6 (15.2)

1 (25.4)

1

1. Special floor base or air conditioning coil required for use on combustible floor.

Yes

Yes

Yes

No

Downflow B-Vent

1 (2.5)

1 (2.5)

0 (0.0)

0 (0.0)

0 (0.0)

1 (2.5)

1 (25.4)

1

Yes

Yes

Yes

No

Horizontal

1 (2.5)

1 (2.5)

0 (0.0)

0 (0.0)

0 (0.0)

6 (15.2)

Combustible

No

Yes

Yes

Yes

2

2. Line contact only permitted between lines formed by the intersection of the rear panel and side panel (top in horizontal position) of the furnace jacket and building 

joists, studs or framing.

Horizontal B-Vent

1 (2.5)

1 (2.5)

0 (0.0)

0 (0.0)

0 (0.0)

1 (2.5)

Combustible

No

Yes

Yes

Yes

2

Содержание GG8S*MP

Страница 1: ...Position without filter Bottom Return 24 Blower Performance CFM Any Position without filter Left Side Return 25 These high efficiency compact units employ induced combustion reli able hot surface ign...

Страница 2: ...binet support the ends of the furnace rather than lifting by the cabinet flanges at the return air openings bottom or sides or supply air opening 13 When lifting the furnace it is acceptable to use th...

Страница 3: ...the National Fire Protection Association Inc Batterymarch Park Quincy MA 02269 or for only the NFGC contact the American Gas Association 400 N Capital N W Washington DC 20001 or www NFPA org CANADA NS...

Страница 4: ...noxide detector with an alarm and battery back up is installed on the floor level where the gas equipment is to be installed In addition the installing plumber or gasfitter shall observe that a batter...

Страница 5: ...otated down for shipment In order to use the flanges remove the screw holding an individual flange rotate the flange so it is in the upward position and reinstall the screw then repeat this for all 4...

Страница 6: ...CE ASSEMBLY PC SERIES COILS These upflow coils are designed for installation on top of upflow fur naces only If the coil is used with a furnace of a different size use a 45 transition to allow proper...

Страница 7: ...will be necessary to seal the edges of the bottom panel to the casing using tape or other appropriate gasket material to prevent air leakage BOTTOM RETURN AND ATTIC INSTALLATIONS Bottom return applica...

Страница 8: ...one support at the supply end of the furnace one support located approximately in the center of the furnace near the blower shelf and the third support should be at the return end of the fur nace Mai...

Страница 9: ...M m3 min Cabinet Size Cabinet Dimensions Inches Approximate Operating Weights A A cm B B cm C C cm Lbs 40 11 7 800 22 7 A 14 1 2 36 8 13 3 8 34 0 10 3 26 2 89 60 17 6 1000 28 3 A 14 1 2 36 8 13 3 8 34...

Страница 10: ...this section specify the type of gas approved for this furnace only use those approved gases The instal lation of a drip leg and ground union is required Refer to Figure 15 FIGURE 13 Side Return Cuto...

Страница 11: ...ne LP gas must have the LoNOx screens removed prior to installation and operation See propane instructions Table 5 Nominal Manifold Pressure Manifold Pressures in wc Manifold Pressures kpa Altitude fe...

Страница 12: ...ct the thermostat wiring from the wiring connections on the thermostat to the terminal board on the ignition module as shown in Figures 17 or 18 Electronic thermostats may require the common wire to b...

Страница 13: ...ressor G Fan PP11C70224 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Clipping Jumper W914 for electric heat on thermostat is not necessary 24VAC Humidifier Optional C...

Страница 14: ...S HGD HP RHS O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot W1 66 out Heat Y Compressor DEMAND DEFROST CONTROL X L Malfunction Light W Auxiliary Heat SINGLE STAGE HEAT PUMP 1 1 Par...

Страница 15: ...he furnace that operates on W2 will be supplying cold air in the Heating mode to the occupied spaces unless W2 is energized GAS PIPING Furnace gas supplies must be provided as specified with these ins...

Страница 16: ...scribed below 2 Connect a wire from the TWIN terminal of Furnace 1 to the TWIN terminal of Furnace 2 3 Install a separate 24V relay as shown in the diagram below Use of this relay is required as it en...

Страница 17: ...ney must extend at least 5 ft 1 5 m above the highest equipment draft hood or flue collar FAN ASSISTED COMBUSTION SYSTEM This appliance is equipped with an integral mechanical means to either draw pro...

Страница 18: ...must be given consideration in calculating free area If the free area of a specific louver or grille is not known Refer to Table 7 to estimate free area Ventilated Combustion Air The ventilated attic...

Страница 19: ...simply slide the NOx screens out of the heat exchanger tubes and discard the screens 8 Replace all components in reverse order Reconnect all wiring CARBON MONOXIDE POISONING HAZARD Failure to follow t...

Страница 20: ...ilots 2 Run furnace for a minimum of 3 minutes in heating operation 3 Measure time in sec for gas meter to complete 1 revolution and note reading The 2 cubic feet dial provides a more accurate mea sur...

Страница 21: ...22 164 327 818 64 56 112 281 23 157 313 783 66 54 109 273 24 150 300 750 68 53 106 265 25 144 288 720 70 51 103 257 26 138 277 692 72 50 100 250 27 133 267 667 74 48 97 243 28 129 257 643 76 47 95 23...

Страница 22: ...n and follow the operating instructions to place the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After the mani...

Страница 23: ...must be long enough to adequately cool the furnace but not so long that cold air is blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as...

Страница 24: ...638 2540 2448 2339 2224 2111 1974 1831 Medium High 2234 2233 2147 2092 2042 1974 1907 1820 1705 1575 Medium Low 1722 1716 1690 1681 1603 1553 1489 1426 1335 1241 Low 1396 1375 1348 1325 1263 1200 1150...

Страница 25: ...ow 1126 1115 1095 1049 1027 996 957 929 840 742 080C22 High 2972 2863 2769 2671 2571 2465 2352 2227 2095 1950 Medium High 2173 2146 2103 2082 2036 1966 1904 1827 1738 1621 Medium Low 1670 1667 1647 16...

Страница 26: ...ion occurs and the flame sensor begins its sensing function The blower motor will energize 30 seconds after the gas valve opens if a flame is detected Normal furnace operation will continue until the...

Страница 27: ...ed Flashes description below If the main limit switch opens five times within a single call for heat the control will also indicate 4 Red Flashes and will enter a one hour soft lockout 5 RED FLASHES T...

Страница 28: ...ill flash three green flashes when the memory has been cleared then will resume the normal slow green flash after a five second pause SECTION X REPLACEMENT PARTS LIST DESCRIPTION MOTOR MOTOR DIRECT DR...

Страница 29: ...lower motor speed connections shown are typical but may vary by model and application LEGENDE DS Commutateur de porte MOT Moteur soufflerie TST Thermostat ROS Commutateur de roulement IDM D induct mot...

Страница 30: ...ge without notice Published in U S A 356485 UIM G 1211 Copyright 2011 by Johnson Controls Inc All rights reserved Supersedes 356485 UIM F 0910 Johnson Controls Unitary Products 5005 York Drive Norman...

Отзывы: